My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info-including design for general purposes only
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Drive
>
1150 Pine View Drive - 28-118-23-42-0009
>
Septic
>
septic info-including design for general purposes only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:42 PM
Creation date
7/9/2018 11:05:54 AM
Metadata
Fields
Template:
x Address Old
House Number
1150
Street Name
Pine View
Street Type
Drive
Address
1150 Pine View Dr
Document Type
Septic
PIN
2811823420012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=s� 0.60 gpolft� Abs�rptlon area Soil Loading Rate, which gives a mound ratio of 2 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.0 <br /> aa� �3 percent site stope (0-209K range) �3 (%downslope site slope, if different than upslope) <br /> ?s► 22 inthes, or 1.8 ft. to Redox or other limiting condition (need at least 12"to be a Type q <br /> Trearment zone contaihs�inches of 095 soil credit, and �inches of 50%w9l credit. Giving a: <br /> ae� 14 inch, or 1.2 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICAT'IONS!!! <br /> z�, 20.0 ft.Total ABSORPTION width (with sand beyond rakbed as foitows:) <br /> 2s, 0.0 ft. upslope and sideslope <br /> 10.0 ft. Downslope <br /> Individual slope ratios give BERM widths(topsoit beyond rockbed)of: <br /> s9, 4:1 upslope ratio 11 ft. upstope berm <br /> �o� 3:1 sideslope 92 ft. sideslope berms <br /> sii 4:1 downslope 72 ft. dovmslope berm <br /> s�� Overatl Dimensions: 10.0 ft. wide by 31.3 ft. long Rock bed <br /> 33 ft, wide by 55 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" ca�er on top <br /> U slo e berrn �� Downslo e berm 12 <br /> _ �—� 12" cover on sides <br /> .-.-�'" �`'- ,,,� (6"1onmq cap�i6"topea�} <br /> 1.2 C.it���� 5.�1�c;1 :1,>`? ��-•,,,.. <br /> _ .. _ _ ._ _ 1.8 ' :-:: �: _ : . _ ``- <br /> _, ... .-_ �__ ._ �� .__._ - -- - -.__ _ .__. _ _._ <br /> Ab tion Width 20.0 � --- - -- -_.�_ __._ .�_ . <br /> Note: <br /> For�O to 19�slopes, Absorptron �YJ`dth is measured from the Be�deqt,�a{ly in both directiorrs. <br /> For slapes >1�, �4,6sorption N�Ir�h is measured downhill fram the upslope ed�e of the B�a! <br /> 33) Rock Bed: <br /> 10.0 ft. by 31.3 ft. by �inches under pipe, ptus 24%gives 11 yd'or•1.4� 15 ton <br /> 3a1 Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed,Facchange sand for loamy cap if desired) <br /> 14J up + 24.2 downstope + 6J ends+ 15.2 under rock= �yd'or"1,4= 102 ton <br /> plus 20% <br /> 3s� Loamy Cap: <br /> 29 ft. by 51 ft. 6"deep, plus 20A6 gives 34 yd'ar"1.4= 48 ton <br /> ab� TopsoiL• <br /> 33 ft. by 55 ft. 6"deep, ptus 20%gives 41 yd'or*1.4= 57 ton <br /> I hereb r ertify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> � Rusty qlson'f Soil£t Perc 810 4/10/2017 <br /> esigner Sig�ature Company License# Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.