Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Tuesday,July 25, 2017 10:23 AM <br /> To: Christine Mattson <br /> Subject: RE: 135 Luce Line Ridge/#2016-01465 <br /> Chris, <br /> The as built appears to generally conform with the approved plan with the following exceptions: <br /> 1. Gravel has been placed to the east of the new garage. <br /> 2. A retaining wall has been built to the west of the new garage. Spot elevations indicate that it is below the 4 <br /> ft threshold. <br /> 3. A boulder flume has been built to the northeast of the garage. <br /> An inspector should conduct a site visit and confirm the following: <br /> 1.The survey accurately depicts conditions on the ground. <br /> 2.The site is stabilized to the point the any remaining erosion control can be removed. <br /> 3.The retaining wall to the west of the garage does not exceed 4ft in height. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Monday,July 24, 2017 8:11 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: RE: 135 Luce Line Ridge/#2016-01465 <br /> Adam, <br /> We received an as-built survey for 135 Luce Line Ridge. Please review and provide comments. <br /> Thank you! <br /> From:Adam Edwards <br /> Sent:Tuesday, December 20, 201611:08 AM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Subject: RE: 135 Luce Line Ridge/#2016-01465 <br /> Stamped grading plan approved <br /> From:Christine Mattson <br /> Sent:Tuesday, December 20, 2016 10:17 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: FW: 135 Luce Line Ridge/#2016-01465 <br /> Adam, <br /> 1 <br />