Laserfiche WebLink
Below is updated information. The file is in your inbox. Thank you! <br /> From: Mike Johnsrud [mailto:mhiohnsrud@comcast.netl <br /> Sent: Monday, December 19, 2016 5:55 PM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us>; brian@bvconstructiomm�.com <br /> Cc: Irci@earthlink.net; Roger Peitso<rpeitso@ci.orono.mn.us> <br /> Subject: RE: 135 Luce Line Ridge/#2016-01465 <br /> Christine, <br /> Our survey is complete and I will be bringing it in tomorrow morning. Also, as we discussed on the phone, <br /> here are the answers to the other items you addressed in your letter dated 12/8/2016. <br /> 1. Certificate of Survey. I will bring in the revised survey tomorrow <br /> a. a.i - Contours - Complete <br /> b. a.ii — General information. We will not be disturbing the area where this building is <br /> going. The building is framed"pole type"but the building will look like it was stick <br /> framed. There will not be typical foundation disturbances because this is not a typical <br /> excavated foundation. The area where this building is going is relatively flat as outlined by <br /> the contours. <br /> i. Erosion control —The ground is frozen and snow covered and there won't be erosion <br /> because there is not a typical excavation. <br /> ii. Construction access —the access will be our driveway (approx. 150�. If you <br /> referring to tire/wheel debris possibly getting into the street, again, this will not be a <br /> typical excavation and no material will need to be hauled away. <br /> iii. Stockpile location — I assume you mean for excavation. We will be boring holes (not <br /> the typical excavated foundation). If you would like, I can place erosion control logs <br /> around the perimeter of the area. No material will need to be stockpiled for hauling <br /> away. <br /> c. a.iii — Grading plan —Again, the area where this building is going is relatively flat. Grading <br /> is not necessary for placement of this building. I asked the surveyor about this item <br /> specifically and he did not place any erosion control because there isn't any excavating <br /> necessary for this project. However; as I stated earlier, I could place erosion control logs <br /> around the perimeter of the area if you would like. <br /> 2. Landscape plan <br /> a. There will not be any changes to the landscape with this project. We plan on having grass <br /> and mulch around this building that mirrors the rest of our yard. <br /> 3. Oversized Accessory Structure Covenant <br /> a. Michael Harold Johnsrud — Husband <br /> b. Suzanne Denise Johnsrud —Wife <br /> I will come into the office tomorrow morning. I will ask for you to verify that the answers above are sufFcient <br /> to your concerns. <br /> Thanks, <br /> Mike]ohnsrud <br /> From: Christine Mattson [mailto:CMattson@ci.orono.mn.usl <br /> Sent: Thursday, December 08, 2016 10:41 AM <br /> 2 <br />