Laserfiche WebLink
- w , <br /> �°� �'_ <br /> O O CI'TY OF ORONO <br /> � � Muaicipal Offices <br /> r�„ �, Street Addreas Mailing Address: <br /> � G'�' 2750 Kelley Parkway P.O.Box 66 <br /> '�.9 �i Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> kESHo�' <br /> To: The Current Owner of Address 1480 LONG LAKE BLVD <br /> City Ordinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> periodic basis. The onsite sewage treatment system at the above address has been inspected and <br /> the following is known about the system. A sketch of the known components of the system is <br /> available for most properties at the Orono City Hall. <br /> Imminent Public Healt hreat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 954-249-4626 within 10 days of receipt of <br /> this notice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> will result in referral to the City Attorney for legal action. <br /> System Identified as N -Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pum out Needed <br /> Yes <br /> No <br /> The city recommends the septic tank(s) and/or lift tank be serviced and umped out every three <br /> (3) years. City records indicate the tank(s)were last pumped out on �- �' �O.� <br /> The tank(s) should be cleaned through the manhole and not through the inspection pipes, this <br /> allows for proper cleaning. <br /> Comments: <br /> ��C'�"�' ���.�/�- <br /> Inspector. Date of Inspection: ��- d� <br /> Telephone (952) 249-4600 • Fax(952) 249-4616 <br /> www.ci.orono.mn.us <br />