Laserfiche WebLink
' n.,"c�st�o'� l'cn�lr� I�J:;I.' ,r/�l„o r.� . ,..<.„.�nA!Uiin.itivoAtUonEqu.r/Uj:purlUnrty(mpi,>y��; <br /> B���St��O Prr,�ip��s O[ro G.Bonestroc.P_E•Joseph C�Anderlik,RE• M�rvin L Sorvala,PE • <br /> R.�ch�rd F.Tumer,P.:.• Glenn G1.�ook P.E • Thomas E.Noyes,P.E• Robert G.Schunicht,RE• <br /> Rosene �err} A Bourdon PE • Rober[W Rosene,PE.{nd Susan M Eberlin CPA,Senior ConsWtants <br /> � Associate Principals How,ird A.Sanford.PE• Keith A Gordon.P.E• Robert R.Pfefferle.PE• <br /> Anderlile � Richard W Fosrer f E • D�{vid Q Lotkota PE• Roheri C Russek A I A • Mark A Hanson PE • <br /> �:".i�hael T.Rautmann,P.E• Te�d K.Field,f.E.• Kev�neth P.Anderson,I'.E.• Mark R.Rolfs,f'E• <br /> Associates �����cy f'Willi,imson PE LS • Robcrt F Kotsmi[h <br /> C)If��,�s�SL Paul,Roches[er,Willmar and SC Cloud, MN•Mequon,WI � <br /> Engineers & Architects <br /> ��,w-' <br /> September 21, 1995 �� 'L� <br /> �.�. �1c����i, <br /> �� ,� <br /> Ms. Jeanne A. Mabusth � �'""" ' ��'� "°� ��'��� <br /> '��, i",;,_�,,.,;_ <br /> Building and Zoning Administrator � � <br /> City of Orono � � <br /> Post Office Box 66 <br /> Crystal Bay, Minnesota 55323 <br /> Re: Tony Eiden <br /> c•, r� ,3o-��n? <br /> : � . c. . <br /> Dear Jeanne, <br /> We have reviewed the proposal to install a 6-inch draintile line north from the existing pond within Old Crystal <br /> Bay Road Addition; across Lots 1,2 and 3,Block 3; under Countryside Drive West; and across Lots 1, 2 and <br /> 3,Block 2 to improve the subsurface drainage in this area. Silt fence should be installed at the downstream <br /> limits prior to commencing with the work. The draintile line must be installed at a minimum grade of 0.6 <br /> percent to prevent siltation within the pipe. Cleanouts should be installed at all angle points in the line, spaced <br /> no more than 400 feet apart. At least six cleanouts will be needed based on the submitted layout sketch. <br /> Drainage easements will need to be provided ten feet wide centered on the draintile line across Lots 1 and 2, <br /> Block 3 and Lots 1 and 2,Block 2. As-built plans should be submitted with the actual draintile line locations <br /> shown within one month of completing the work. <br /> Countryside Drive West must be repaired to its original cross-section or to a minimum of geotextile fabric, <br /> eight inches of Class 5 aggregate base, 100%crushed quarry rock,and 3.5 inches of bituminous mixture(Type <br /> 4l)whichever is greater. The contractor must talce care to cut the existing geotextile fabric at the center of the <br /> trench and pull the fabric aside while installing the draintile, and the lay the fabric back over the compacted <br /> trench. A new piece of fabric shall then be installed over the cut fabric to form a suitable overlapped joint. <br /> The bituminous must be placed in two lifts. All backfill below the Class 5 aggregate must be granular barrow <br /> material meeting MnDOT Specification No. 3149. Access along Countryside Drive West must be maintained <br /> at all times,keeping one lane of traffic open. Traffic control must be installed and maintained in accordance <br /> with the MMUTCD. The City should be notified for inspechon at least 24 hours prior to removing�i�e sur�ace <br /> of Countryside Drive West. We would recommend a$10,000 letter of credit be provided to the City to insure <br /> that the work is done satisfactorily. <br /> Please contact me at this office if you have any questions regarding this matter. <br /> Yours very truly, <br /> BONESTROO, ROSENE, ANDERLIK&ASSOCIATES, INC. <br /> iX�� �' '-'�/ <br /> Shawn D. Gustafson,P.E. <br /> cc: Greg &Jewel Vitas, 2800 Countryside Drive West,Orono, MN 55356 <br /> Tony Eiden FAX 559-6423 <br /> Russ Olson, Clover Hill Company Inc.,Box 354, Loretto, MN 55357 <br /> 2335 West Highway 3G ■ St. Paul, MN 55113-3898 ■ G12-G3G-4G00 <br />