' n.,"c�st�o'� l'cn�lr� I�J:;I.' ,r/�l„o r.� . ,..<.„.�nA!Uiin.itivoAtUonEqu.r/Uj:purlUnrty(mpi,>y��;
<br /> B���St��O Prr,�ip��s O[ro G.Bonestroc.P_E•Joseph C�Anderlik,RE• M�rvin L Sorvala,PE •
<br /> R.�ch�rd F.Tumer,P.:.• Glenn G1.�ook P.E • Thomas E.Noyes,P.E• Robert G.Schunicht,RE•
<br /> Rosene �err} A Bourdon PE • Rober[W Rosene,PE.{nd Susan M Eberlin CPA,Senior ConsWtants
<br /> � Associate Principals How,ird A.Sanford.PE• Keith A Gordon.P.E• Robert R.Pfefferle.PE•
<br /> Anderlile � Richard W Fosrer f E • D�{vid Q Lotkota PE• Roheri C Russek A I A • Mark A Hanson PE •
<br /> �:".i�hael T.Rautmann,P.E• Te�d K.Field,f.E.• Kev�neth P.Anderson,I'.E.• Mark R.Rolfs,f'E•
<br /> Associates �����cy f'Willi,imson PE LS • Robcrt F Kotsmi[h
<br /> C)If��,�s�SL Paul,Roches[er,Willmar and SC Cloud, MN•Mequon,WI �
<br /> Engineers & Architects
<br /> ��,w-'
<br /> September 21, 1995 �� 'L�
<br /> �.�. �1c����i,
<br /> �� ,�
<br /> Ms. Jeanne A. Mabusth � �'""" ' ��'� "°� ��'���
<br /> '��, i",;,_�,,.,;_
<br /> Building and Zoning Administrator � �
<br /> City of Orono � �
<br /> Post Office Box 66
<br /> Crystal Bay, Minnesota 55323
<br /> Re: Tony Eiden
<br /> c•, r� ,3o-��n?
<br /> : � . c. .
<br /> Dear Jeanne,
<br /> We have reviewed the proposal to install a 6-inch draintile line north from the existing pond within Old Crystal
<br /> Bay Road Addition; across Lots 1,2 and 3,Block 3; under Countryside Drive West; and across Lots 1, 2 and
<br /> 3,Block 2 to improve the subsurface drainage in this area. Silt fence should be installed at the downstream
<br /> limits prior to commencing with the work. The draintile line must be installed at a minimum grade of 0.6
<br /> percent to prevent siltation within the pipe. Cleanouts should be installed at all angle points in the line, spaced
<br /> no more than 400 feet apart. At least six cleanouts will be needed based on the submitted layout sketch.
<br /> Drainage easements will need to be provided ten feet wide centered on the draintile line across Lots 1 and 2,
<br /> Block 3 and Lots 1 and 2,Block 2. As-built plans should be submitted with the actual draintile line locations
<br /> shown within one month of completing the work.
<br /> Countryside Drive West must be repaired to its original cross-section or to a minimum of geotextile fabric,
<br /> eight inches of Class 5 aggregate base, 100%crushed quarry rock,and 3.5 inches of bituminous mixture(Type
<br /> 4l)whichever is greater. The contractor must talce care to cut the existing geotextile fabric at the center of the
<br /> trench and pull the fabric aside while installing the draintile, and the lay the fabric back over the compacted
<br /> trench. A new piece of fabric shall then be installed over the cut fabric to form a suitable overlapped joint.
<br /> The bituminous must be placed in two lifts. All backfill below the Class 5 aggregate must be granular barrow
<br /> material meeting MnDOT Specification No. 3149. Access along Countryside Drive West must be maintained
<br /> at all times,keeping one lane of traffic open. Traffic control must be installed and maintained in accordance
<br /> with the MMUTCD. The City should be notified for inspechon at least 24 hours prior to removing�i�e sur�ace
<br /> of Countryside Drive West. We would recommend a$10,000 letter of credit be provided to the City to insure
<br /> that the work is done satisfactorily.
<br /> Please contact me at this office if you have any questions regarding this matter.
<br /> Yours very truly,
<br /> BONESTROO, ROSENE, ANDERLIK&ASSOCIATES, INC.
<br /> iX�� �' '-'�/
<br /> Shawn D. Gustafson,P.E.
<br /> cc: Greg &Jewel Vitas, 2800 Countryside Drive West,Orono, MN 55356