Laserfiche WebLink
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR MARCH 20, 1995 <br />ROLL <br />The Orono Planning Commission met on the above date with the following members <br />present Chair Charles Schroeder, Stephen Peterson, Sandra Smith, Dale Lindquist, <br />Candace Rowlette, Charles Nolan, Jr , and Janice Berg Building and Zoning <br />Administrator Jeanne Mabusth and Recorder Sherr>' Frost represented Staff. <br />Councilmembers Jabbour and Goetten were present. Chair Schroeder called the meeting <br />to order at 7:00 p m <br />SCHEDULED PUBLIC HEARINGS/FUBLIC INFORMATION MEETING <br />(#1) 7:00 P.M. #2000 CORTLEN G. CLOUTIER, 2480 CASCO POINT ROAD - <br />PRELIMINARY SUBDIVISION, CLASS I - PUBLIC HEARING 7:00-7:53 P.M. <br />The Certificate of Mailing and /Affidavit of Publication were noted. <br />The Applicant, Mr. Cloutier, was present <br />Mabusth reported that the appli; Hr.on is for a division of legally combined lots 1, 3,4, artd <br />outlot 1, which is a type I classification of subdivision. These lots were originally <br />combined for tax purposes. The applicant is asking for a division of Lot I, which meets all <br />requirements. The issue is access. The existing access will serve lot 1. The access <br />currently serves the homestead parcel. The drive would be altered to only serve lot 1, and <br />the homestead parcel (combined lots 3 and 4) will be served by existing drive at Frederick <br />Street. When the land was subdivided, an outlot (20' wide) was created within the Tillson <br />Villa Carman subdivision Lots 1 -4 could gain access from the road outlot and lot 5 from <br />Frederick Street. Today, lot 2 achieves access from outlot and combined lots 1, 3, and 4 <br />from direct accesses at Casco Point Road and Frederick Street. <br />At this time, Mabusth commented that it was important to determine what are the future <br />plans for the lots; mainly, if there would be a future division of lots 3 and 4. The new lots <br />must meet requirements of current code and provide approved legal access. There is <br />adequate area to subdivide lots I, 3, and 4. The required area for each lot will depend on <br />whether the lot will achieve access via a private road or driveway outlot. Lot 1 has access <br />from Casco Point Road from an existing approved curb cut. Lot 4 has an existing access <br />from Frederick Street. The code states that only two lots can be served from a driveway <br />uv.’tlot and that the back lot meet 150% of required area. <br />The lines of existing sewer and water service to rei;:dence would need to be located and <br />shown on survey. The location for the water connection for the original house is <br />unknown The sewer may come from Casco Point Road. There may be a need for an <br />easement depending on their locations A municipal sewer line intersects lot 4 at the <br />northwest comer. The City would ask for an easement over the sewer line. <br />1