My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2015 Council Work Session Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1974-2024 Minutes - work sessions
>
2015
>
02-23-2015 Council Work Session Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 9:21:46 AM
Creation date
10/1/2015 9:21:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Work Session February 23, 2015 Page 1 <br /> <br />MINUTES OF THE <br />ORONO CITY COUNCIL WORK SESSION <br />February 23, 2015 <br />5:00 o’clock p.m. <br />________________________________________________________________________________ <br /> <br />PRESENT: Mayor Lili Tod McMillan, Council Members Jim Cornick, Jr., Lizz Levang, Aaron Printup, <br />and Dennis Walsh. Representing Staff were City Administrator Jessica Loftus, Finance Director Ron <br />Olson, Senior Planner Michael Gaffron, City Planner Melanie Curtis, Public Works Director/City <br />Engineer Adam Edwards, Police Chief Correy Farniok, City Attorney Soren Mattick, and City Clerk <br />Diane Tiegs <br /> <br /> <br />1. Street Funding Discussion (moved to accommodate residents present for the discussion) <br />a. Baldur Park Road Improvements <br />Public Works Director/City Engineer Adam Edwards reported that the Baldur Park Road is <br />in need of being rebuilt and it is timely to use FEMA funds from the flooding damage that <br />occurred to that road. The initial estimate for rebuilding the road is $223,917 with $59,223 <br />available in FEMA funds that can be used towards that project. The City has 18 months to <br />make use of the FEMA funds for the flooding repairs. The timeline for this project is to <br />present a proposal to Council for approval during a March Council meeting, award the <br />contract in May with construction completed by October 2015. <br /> <br />Council discussed the curb and gutter portion of the quote request. Edwards stated the <br />soil is poor and by installing curb and gutter it will assist with drainage. He also noted that <br />curb and gutter were added to the quote because of a petition received from residents in <br />that area. <br /> <br />Council discussed additional signage imposing tougher weight restrictions to conserve the <br />roadway. Edwards stated seasonal weight restrictions of 4 ton are in effect annually each <br />spring from mid March to mid May. The road is primarily used by the residents and the <br />stringent restrictions would affect the resident’s services for their garbage or occasional <br />projects that require heavier truck delivery. <br /> <br />Edwards will contact Bolton & Menk to prepare an engineering proposal to be presented at <br />a March Council meeting. Printup would like axel weight limits included in the report. <br /> <br />b. Watertown Road <br />Watertown Road shares a boundary between the cities of Orono and Long Lake. Long Lake <br />is considering a full reconstruction that will include utility replacement on the portion of <br />Watertown Road located between Brown Road and Willow Drive in 2016. The City of Long <br />Lake has approached Orono with a proposal to consider a joint project. Long Lake would <br />lead the project with Orono participating in a joint financial arrangement. Orono is
The URL can be used to link to this page
Your browser does not support the video tag.