My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Grading Plan and Stormwater management plan
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2687 Wayzata Blvd W - 33-118-23-13-0002
>
Correspondence
>
Grading Plan and Stormwater management plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:16 PM
Creation date
2/5/2020 1:40:54 PM
Metadata
Fields
Template:
x Address Old
House Number
2687
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2687 Wayzata Boulevard West
Document Type
Correspondence
PIN
3311823130002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Highway w <br /> St.P <br /> St.Paul,MN 5511 13 <br /> 'il ff lO Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br /> May 28, 2009 Bonestroo <br /> Melanie Curtis <br /> Planning &Zoning Coordinator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: 2687 Wayzata Boulevard <br /> File No. 000139-09000-2 <br /> Building Permit No. 2009-00122 <br /> Dear Melanie: <br /> We have reviewed the grading plan and stormwater management plan dated 5-19-09 for parking <br /> lot expansion and rain garden at 2687 Wayzata Boulevard. Our review includes a compliance <br /> check for Chapter 79 of Orono's Land Use Code. We have the following comments: <br /> • Concrete curb and gutter should be installed around the perimeter of the parking lot. <br /> • The discharge rates for the rain garden (4.63 cfs 10-year and 6.79 cfs 100-year <br /> event) exceed those of the existing conditions (2.96 cfs 10-year and 4.50 cfs 100- <br /> year event). All runoff rates for proposed conditions should be less than or equal to <br /> existing condition rates. <br /> • Geotechnical reports for the adjacent Crystal Bay Business Center indicated that <br /> parking lot pavement sections include a 12-inch select granular, 6-inch aggregate <br /> base, and 3-inch bituminous pavement section for normal duty pavement. Heavy <br /> duty pavement (drive lanes of the parking lot) was to have 24-inches select granular, <br /> 8-inches of aggregate base, and 4-inches of bituminous. We would recommend <br /> using these pavement sections or have the applicant submit a geotechnical report <br /> stating that the 6-inch aggregate base and 2.5-inch bituminous is sufficient. <br /> • Draintile should be provided for the rain garden. <br /> • The applicable code section is 79-7(c)(2) for all commercial or industrial sites in <br /> which land disturbance activities fill or excavate more than 100 cubic yards. <br /> • To bring this submittal in to compliance with the ordinance, the following information <br /> should be provided separately or on the grading plan. <br /> o Phasing plan. A phasing plan shall be provided that clearly indicates the <br /> areas in the order they are to be disturbed and restored. The phasing plan <br /> shall consider minimization of area and duration of exposed soil and unstable <br /> conditions, minimization of the disturbance of natural soil cover and <br /> vegetation, erosion and sediment control measure installation, weather <br /> conditions and the schedule for temporary and permanent restoration. The <br /> area and duration of each phase shall be indicated on the plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.