1 <br /> City of Orono Page 2 <br /> 09-00122 May 28,2009 <br /> o Standard detail sheet. A standard detail sheet shall be provided that consists <br /> of applicable construction details for approved erosion and sediment control <br /> measures as developed by the City. Other techniques may be used upon <br /> prior approval by the City with details provided by the designer. <br /> o Specifications. Written specifications for land disturbance activities such as <br /> product descriptions, installation and maintenance procedures required by <br /> the applicant to carry out the project in accordance with this Chapter. <br /> o Temporary erosion and sediment control plan: Indicate the location of <br /> perimeter controls, construction fence, temporary sedimentation basins, inlet <br /> protection, areas to be seeded, areas to be mulched or blanketed, location of <br /> construction waste control (dumpsters, chemical storage, concrete washout, <br /> portable restroom facilities, etc.)and all other required temporary erosion <br /> and sediment control measures. This plan shall also indicate staging of <br /> temporary erosion control measures. <br /> o Permanent erosion and sediment control plan: Indicates areas to be seeded <br /> and sodded, sediment ponds, storm sewer systems and all other required <br /> permanent erosion and sediment control measures. Permanent storm water <br /> pollution controls including, but not limited to ponds,vegetated buffers and <br /> structural measures shall be designed and constructed in accordance with <br /> other Chapters of the City Code and requirements of other agencies having <br /> jurisdiction. <br /> o Narrative: Describes, at a minimum, the nature of construction activity, <br /> person(s) responsible for inspection and maintenance of site erosion and <br /> sediment control including contact information, project phasing, schedules, <br /> along with the timing, installation and maintenance of erosion and sediment <br /> control measures and specifications necessary to carry out the project. <br /> o The$2,000 financial guarantee identified in Section 79-7(b)(2) should be <br /> sufficient for this project. <br /> If you have any questions, please call me at(651) 604-4894. <br /> Yours very truly, <br /> Darren Amundsen <br /> Cc: Tom Kellogg <br />