Laserfiche WebLink
% 96o)4V 0�-\, <br /> == �� CITY of ORONO <br /> Municipal Offices <br /> Street Address: Mailing Address: <br /> 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> August 4, 1998 <br /> Mike and Lori Arne <br /> 125 Truffula Trail <br /> Long Lake, Minnesota 55356 <br /> Re: Building Code Issues <br /> Dear Mr. and Mrs. Arne: <br /> This letter is in response to your letter of July 21, 1998 and our meeting of July 29, 1998. The <br /> following is an item-by-item response to your concerns: <br /> Our measurement to the edge of the sill indicates an 8"rise. Method of measurement <br /> is open to interpretation. No action to be taken. <br /> - Front stoop is cracked. It is now apparent this is a structural problem and must be <br /> repaired. Options would be to replace the stoop and its foundation or to repair per <br /> a structural engineer's recommendations. <br /> - Lack of seal around patio doors, etc. Doors and windows must be installed per <br /> manufacturer's requirements. Contractor to receive manufacturer's approval on <br /> repairs. <br /> ' - Mound septic does not meet code. Absorption width to be increased to meet code <br /> requirements. <br /> Reseal joints on manhole rises. Steve Weckman witnessed this work, and after <br /> regrading around tanks,no leakage has been detected. No action to be taken. <br /> - Class B flue noises. Wall must be opened up for inspection of firestop installation. <br /> - The air conditioning unit does not have proper clearance. Unit must be moved to <br /> meet manufacturer's requirement. <br /> Telephone (612) 473-7357 • FAX 473- N10 <br />