My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
wildlife Monitoring program-2015
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0520 Tonkawa Road - 05-117-23-32-0005
>
Misc
>
wildlife Monitoring program-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:13:17 PM
Creation date
5/20/2019 2:09:37 PM
Metadata
Fields
Template:
x Address Old
Address
0520 Tonkawa Rd
Document Type
Misc
PIN
0511723320005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON 8L M F==N K , I NC® <br /> Consulting Engineers & Surveyors 52.p 1-oyt��p, VcL <br /> 2638 Shadow Lane, Suite 200•Chaska, MN 55318-1172 <br /> Phone(952)448-8838•Fax(952)448-8805 <br /> www.bolton-menk.com <br /> Preconstruction Meeting Minutes <br /> Project: Nelson Restoration Project <br /> City of Orono,MN <br /> Date/Time: January 27,2015 <br /> Place: Orono City Hall <br /> Attendance: Please complete sign in form when passed around <br /> Purpose: Introduce involved parties;identify their involvement and their contact people. <br /> Review contract requirement,expectations and establish protocol. <br /> Owner: Private <br /> City Contacts: <br /> • Melanie Curtis,City Planner <br /> o mcurtis@ci.orono.mn.us <br /> o (952) 249-4627 <br /> • Adam Edwards, City Engineer/Director of Public Works <br /> o aedwards@ci.orono.mn.us <br /> o (952) 249-4661 <br /> • Dave Martini,Bolton &Menk <br /> o davidma@bolton-menk.com <br /> o (612)756-4315 <br /> Owner Contacts: <br /> • Doug Mensing,AES <br /> General Contractor: <br /> • Matt Lasch,AES <br /> Plan Review/Revisions: <br /> • Approved plan dated August 13, 2014. <br /> • Plan revisions must be reviewed and approved by the City. <br /> Construction Schedule: <br /> • Evasive specie removal has begun. <br /> • Plantings have been completed in some areas. <br /> • Staking was completed yesterday. <br /> • Compost removal will require temporary displacement of erosion control devices. <br /> • Top foot of excavation will be removed from site. Should require 2-3 days to complete. <br /> • 807 Cubic Yards of material will be removed from site. <br /> • Remaining excavated material will be spread on site(1' or less). <br /> • Excavation will begin once freezing weather returns(possibly next week). <br /> H:\ORNO\C13107766\12-0975 Nelson Restoration\Pre Con Minutes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.