My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
wildlife Monitoring program-2015
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0520 Tonkawa Road - 05-117-23-32-0005
>
Misc
>
wildlife Monitoring program-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:13:17 PM
Creation date
5/20/2019 2:09:37 PM
Metadata
Fields
Template:
x Address Old
Address
0520 Tonkawa Rd
Document Type
Misc
PIN
0511723320005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C) <br /> = BOL .TON & M E—=N K , I N C® <br /> Consulting Engineers & Surveyors <br /> " 2638 Shadow Lane,Suite 200•Chaska, MN 55318-1172 <br /> Phone(952)448-8838•Fax(952)448-8805 <br /> www.bolton-menk.com <br /> • Additional seeding will occur in the spring along with herbicide treatment. <br /> • Channel connections will be completed towards the end of the project. <br /> Permits: <br /> • City—Approved <br /> • County—Approved <br /> • NPDES—Approved <br /> • MCWD—Approved <br /> • Corp. of Engineers—Pending <br /> Maintenance and Control of Traffic: <br /> • Maintenance of traffic is the Contractor's responsibility. <br /> • Must follow traffic control per Hennepin County requirements. <br /> Storage/Staging: On-site <br /> Construction Concerns: <br /> • Hours of Work <br /> 0 7:00 a.m. To 8:00 p.m. Weekdays. <br /> 0 8:00 a.m. To 8:00 p.m.Weekends or holidays. <br /> • Access per Hennepin County and MCWD requirements. <br /> • Street cleaning needed until project completion. <br /> Erosion Control: In place prior to start of construction. Must be maintained throughout construction. <br /> Rock construction entrance. <br /> • Plugged culverts are a pre-existing condition. <br /> • Coordination with MCWD will be required before erosion control devices can be removed and <br /> permits can be terminated. <br /> HAORNO\C13107766\12-0975 Nelson Restoration\Pre Con Minutes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.