Laserfiche WebLink
� w <br /> � O� <br /> O �� O <br /> ���:T-� CI Y of ORONO <br /> � ���� � <br /> ,� '! �..,�=� ,�ti M����� ot��� <br /> t a, <br /> �,� �'��� �`�.`yG Stree3 Addross: Mailln�Addross: <br /> '�c'E'`SBog' <br /> 2750 Kelley Parkw P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> Apri128, 1998 <br /> Dear Project Area Residents; <br /> The City of Orono has scheduled a Neighborhood Info ational Meeting to obtain resident <br /> comments on a proposad sanitary sewer project to serve the Webber Hills Neighborhood. A <br /> project area map is included with this notice. This Neighb rhood Meeting will be held at 7:00 <br /> P.M. Tuesday, May 19th at the Orono City Council C bers. <br /> Introduction <br /> This area was included in the recent MUSA expansion for nitary sewer installation because of <br /> the smaller lot sizes and alder septic systems with limited re lacement sites available. Installation <br /> of new code compliant septic systems will be difficult on s me of the lots in this neighborhood <br /> and system replacements will result in the loss of numero s trees. Approximately 75% of the <br /> existing septic systems in this neighborhood are non-conf ' g with several systems in near <br /> failing condition. This area is one of ten neighborhoods inclu ed in the recent MUSA expansion. <br /> Sewer projects have already been completed in four areas wi an additional two areas scheduled <br /> for completion this summer. We are beginning the planning process for possible 1999 projects. <br /> At this time, interest rates are low providing for more affor able projects. <br /> Project Assessments and Costs <br /> A feasibility study has be�n completed with an estimated roject cost of $961,000 in 1998 <br /> dollars. This results in a pr�posed project assessment of$26, 00 per unit payable over a fifteen <br /> year period. Options for p�jepayment of the assessment are a ailable. Based on several projects <br /> recently completed, the estiriiated interest rate is 6.25%. Base on a 15-year assessment at 6.25% <br /> interest, the annual assessm�nt payments will be approximate $2,700. These project costs and <br /> assessment payments may vary dependent on future construct on costs and interest rates. <br /> 'ilelephone (612) 473-7357 • FAX 47 10 <br />