Laserfiche WebLink
� 1 <br /> The property owner is also responsible for payment of a SAC (Sewer Availability Charge) at the <br /> time the permit for connection is issued. The 1999 SAC chazge will be $1050 per unit. This <br /> money is collected by the City and then forwarded to the Metropolitan Council Environmental <br /> Services Division. This money is used to pay for the additional capacity built in to the MCES <br /> sewer interceptor pipes for future connections to the sewer system. This is a standard charge per <br /> new sewer unit for the entire MCES system in the metro area. <br /> The sewer service pipes will be stubbed out to the property line. The property owner is then <br /> responsible for hiring a licensed plumber to complete the hook up to the new sewer and to <br /> properly abandon the existing septic system. The estimated cost for this work is approximately <br /> $2,000 to $3,000 depending on the length of service required. The City fee for the connection <br /> permit is $35.00. <br /> The current quarterly sewer rate for the entire City is a flat fee of$76.85 <br /> Conclusion <br /> Receipt of residents comments regarding this proposed project is very important and attendance <br /> of this neighborhood meeting is encouraged. In the event you are unable to attend this meeting, <br /> please contact us with your comments. Thank you for your assistance in this matter. <br /> Sincerely; <br /> � -�. �� - , <br /> �� ��� <br /> Grego A. Gappa <br /> Director of Public Services <br /> Copy: Orono City Council Members <br /> Tom Kellog, Bonestroo Engineers <br />