My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-02-2018 Park Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Park Commission
>
Minutes
>
2010-2019
>
2018
>
07-02-2018 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 2:21:57 PM
Creation date
9/20/2018 2:21:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.27 ‘ <br /> MINUTES OF THE <br /> ORONO PARK COMMISSION MEETING <br /> Monday,July 2,2018 <br /> 6:30 o'clock p.m. <br /> ROLL CALL <br /> The Orono Park Commission met on the above-mentioned date with the following members present: <br /> Chair Rick Meyers, Commissioners Jan Berg, Rick Carter, Bryce Johnson, Brian Roath, Julie Ruegemer <br /> and Natalie Williams. Representing Staff were Public Works Director/City Engineer Adam Edwards, and <br /> Recorder Jackie Young. City Council Member Victoria Seals was present. <br /> Chair Meyers called the meeting to order at 6:34 p.m., followed by the Pledge of Allegiance. <br /> The Park Commission agenda was amended to add Item 5, Girl Scout Silver Award. <br /> APPROVAL OF MINUTES <br /> 1. MAY 7,2018,PARK COMMISSION MEETING MINUTES <br /> Berg moved,Roath seconded,to approve the minutes of the May 7,2018,Park Commission <br /> meeting as submitted. VOTE: Ayes 7,Nays 0. <br /> PUBLIC COMMENT <br /> None <br /> PRESENTATIONS <br /> 2. BOY SCOUT PROJECT—SAGA HILLS FOOT BRIDGE—GAVIN MUELLER <br /> Gavin Mueller, Boy Scout,addressed the Park Commission regarding his Eagle Project at Saga Hills. <br /> The project will consist of constructing a 40-foot walkway over a stretch of trail that becomes flooded <br /> periodically near the entrance. The walkway will be built between July 16 and 24 by other Boy Scouts <br /> and family members. <br /> The walkway will be built in four sections of ten feet, four feet wide, with three runners for support. 2 x <br /> 8's will be used for the decking and 2 x 4's used for the runners and end pieces of each section. Ring <br /> shank screws will be used for securing the boards and all lumber will be pressure treated cedar tone wood. <br /> The total estimated cost is $663.99, which includes a 10 percent contingency. The minimum anticipated <br /> cost is $603.63. <br /> Meyers asked whether the money will be coming out of the Park Commission Fund. <br /> Edwards indicated that is correct and that the City will be purchasing the materials. <br /> Meyers asked whether it will be built on site. <br /> Mueller stated the sections will be constructed at his house and then transported to the park. <br /> Roath asked where within the park the bridge will be. <br /> Page 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.