My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-02-2018 Park Commission Minutes
Orono
>
Park Commission
>
Minutes
>
2010-2019
>
2018
>
07-02-2018 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 2:21:57 PM
Creation date
9/20/2018 2:21:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PARK COMMISSION MEETING <br /> Monday,July 2,2018 <br /> 6:30 o'clock p.m. <br /> Mueller indicated it will be located near the entrance. <br /> Edwards noted that area tends to flood seasonally. <br /> Meyers asked whether any other type of pads will be used to help raise the bridge above the water. <br /> Mueller stated he will be adding concrete blocks to raise the elevation. <br /> Roath asked what the expected life is of the bridge. <br /> Mueller stated he is not sure. <br /> Meyers stated 50 years is typical for treated wood, but if it is under water, it will not last that long. <br /> Meyers asked whether there will be any excavation or culverts. <br /> Mueller indicated there will not be. <br /> Meyers asked what the anticipated time schedule is for the bridge. <br /> Mueller stated construction will occur between July 16 to July 24. <br /> The Park Commission took no formal action on this item. <br /> 3. BOY SCOUT PROJECT—HIGHWOOD FOOT BRIDGES—WYATT JONES <br /> Wyatt Jones addressed the Park Commission regarding his Eagle Scout project at Highwood Park. Jones <br /> stated his project consists of constructing and installing two land bridges with a combined length of 72 <br /> feet at the trail in Highwood Park in Orono. The design is rather unique and is based upon docks in Lake <br /> Minnetonka but has been adapted for land use. The sections will be elevated six inches by using pipes <br /> and brackets. Jones stated when he toured the area, the area for the second land bridge section was almost <br /> completely under water, which is the reason why the land bridges will be elevated. <br /> Jones displayed pictures of the two sites where the land bridges will be located. The first site will have a <br /> 32-foot bridge and the second site will be 40 feet. Currently there are planks laid down in those sections. <br /> Jones stated due to its current state, the trails of the park are impossible to traverse without getting wet <br /> and the land bridges will benefit the residents by allowing them to traverse the trails without walking <br /> through water and mud. The land bridges will also benefit the environment as any erosion caused by <br /> walking on the mud will be eradicated. Jones stated labor for the project will be provided by himself and <br /> other Boy Scouts in his troop. <br /> Materials needed for the project include green treated wood, brackets, pipes and mud plates to assemble <br /> the dock sections. The Scouts have most of the necessary tools except for one tool required to pound the <br /> pipes into the ground, which has been included in the cost of the project. <br /> The total cost for the nine sections will be approximately $2,750, which allocates $50 for unexpected <br /> expenses. Public Works Director Adam Edwards stated the City would pay for the materials. Jones <br /> noted the cost of the tool to pound the pipe into the ground is $28.90. A breakdown of the costs includes <br /> Page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.