My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001- Septic system info
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
625 Ferndale Road North - 36-118-23-11-0021
>
Septic
>
2001- Septic system info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:39 PM
Creation date
5/5/2020 10:29:54 AM
Metadata
Fields
Template:
x Address Old
House Number
625
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
625 Ferndale Road North
Document Type
Septic
PIN
3611823110021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(� RQ J 'S,'“) f I tu.N S 333 East Main Street <br /> P.O.Box 388 <br /> rf 1 <br /> 43'�%—�%— ' ' :1111111.V gMUiAM j ' ' Elk River, MN 55330 <br /> (763)441-7509 <br /> (800)554-7509 <br /> Fax:(763)441-9176 <br /> ECO SYSTEMS ENGINEERING,INC. e-mail:h2olab@lkdllink.net <br /> Date: 5/19/01 <br /> Guillaume& Lillian Bastiaens <br /> 625 North Ferndale Rd. <br /> Wayzata, MN 55391 <br /> Re: Changes to sewage treatment system 9/29/00. <br /> Please note the following changes to the proposed sewage treatment system. <br /> 1.)The requirement for an Orenco effluent filter has been changed to an Orenco Biotube pump vault <br /> model PVU57-1819. <br /> 2.)The requirement for a Goulds pump model#3885-E0718H has been changed to an Orenco pump <br /> model#P500712, 3/4hp, 220V. <br /> 3.)The requirement for five fiberglass riser lids has been changed to three each insulated fiberglass <br /> lids. The first septic tank shall have one riser with fiberglass lid, the second tank shall have two risers <br /> with fiberglass lids. <br /> 4.)Orifice sizing has been changed to 3/16", and spacing is changed to 3.5'. Orient the orifices upward to <br /> direct the spray against the top of the chamber. Place one orifice at the bottom of each lateral nearest <br /> to the manifold to allow drainage of the laterals. <br /> 5.)Orifice shields have been removed. <br /> 6.)Drainfield rock has been changed in favor of Infiltrator Brand chambers. <br /> ** See attached spreadsheets and drawings for additional construction details. <br /> Limitations-Our investigation, layout, design, and recommendations are based on data submitted. If conditions <br /> considerably different from those described in this report are encountered, we must be notified. If proposed <br /> construction is changed, we must be notified to evaluate the effect of the changes on the wastewater system. Any <br /> changes to the design must be approved by the designer and will be assessed additional design costs. If changes are <br /> made to the design without the knowledge and approval of the designer the design shall be void. <br /> All construction is to be in accordance with the ISTS regulations. Pipe type and size, installation requirements, <br /> septic tank construction, and other specifications not depicted in our report are to conform to ISTS regulations. <br /> The installer of the system is to be licensed by the Minnesota Pollution Control Agency. <br /> ,1"7:ze„_.fr, --jc----,- ----r=>-7,r..e_— <br /> Kevin J. Kloeppner <br /> Eco Systems Engineering <br /> License#208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.