My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001- Septic system info
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
625 Ferndale Road North - 36-118-23-11-0021
>
Septic
>
2001- Septic system info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:39 PM
Creation date
5/5/2020 10:29:54 AM
Metadata
Fields
Template:
x Address Old
House Number
625
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
625 Ferndale Road North
Document Type
Septic
PIN
3611823110021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/21/01 Page 1 <br /> DESIGN PARAMETERS <br /> Flow Estimated GPD = 750 gallons <br /> Septic Tank Volume = 2250 gallons <br /> Depth to Restricting Layer= >62 inches <br /> Percolation rate = 20 mpi <br /> Soil Sizing Factor = 1.67 sq.ft./gpd <br /> Land slope = 0 % <br /> DRAINFIELD REQUIREMENTS <br /> Infiltrator Model = Standard Sidewinder Chamber <br /> Equivalent Rock Depth = 6 inches <br /> Reduction Factor= 0 % <br /> Trench Bottom Area = 1253 square feet <br /> Lineal Feet = 418 feet <br /> Number of Trenches = 5 each <br /> Length of Trenches = 84 feet <br /> Number of Infiltrator Sections = 13 per trench <br /> PUMP CALCULATIONS <br /> Gallons Per Minute Requirement <br /> Minimum In-Line Pressure/Ft. = 1 feet <br /> Orifice Diameter= 0.187 inches <br /> Spacing of Perfs in Laterals = 3.5 feet <br /> Diameter of Manifold = 2 inches <br /> Length of Manifold = 24 feet <br /> Length of Supply Line = 185 feet <br /> Diameter of Supply Line = 2.0 Inches <br /> Minimum Gallons per Minute = 50 gpm <br /> Head Loss Summations <br /> Supply Line Friction Loss = 4.0 feet <br /> Manifold Head Loss = 0.1 feet <br /> Lateral Network = 0.4 feet <br /> Discharge Assembly = 5.0 feet <br /> Lift to Manifold = 9.8 feet <br /> Total Head Losses = 19 feet <br /> Dose Volumes <br /> Volume of Manifold = 4 gallons <br /> Volume of Laterals = 71.0 gallons <br /> Minimum Dose Volume = 31.3 gallons <br /> Volume of Supply Line= 32.2 gallons <br /> Total Dose Volume = 139 gallons <br />
The URL can be used to link to this page
Your browser does not support the video tag.