My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01187 - mound system
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Drive
>
1135 Pine View Drive - 28-118-23-42-0008
>
Septic
>
2014-01187 - mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:34 PM
Creation date
7/5/2018 2:21:58 PM
Metadata
Fields
Template:
x Address Old
House Number
1135
Street Name
Pine View
Street Type
Drive
Address
1135 Pine View Drive
Document Type
Septic
PIN
2811823420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3• ABSORPTION AREA SIZING <br /> Note:Mound setbocks are measured from the Absorption Area. <br /> A. Calcutate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (1.f)=A6sorption Width <br /> 10.0 ft x 2.0 = 20.0 ft <br /> B. For slopes>1%,the Absorption Width is measured downhill from the upstope edge of the Bed. <br /> Calculate Downslope Absorption Wfdth:Absorption Wfdth (3.A)-Bed Width (2.B)=ft <br /> 20.0 ft - 10.0 ft = 10.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate C(ean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=Clean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.0 ft = 2.0 ft Design Sand Lift(optional): �Z 0 <br /> B. Calculate Upslope Height:C[ean Sand Lift (4.A)+media depth (1 ft.)+cover (1 ft.)=Ups(ope Height <br /> 2.0 ft + 1.0 ft * 1.0 ft= 4.0 ft <br /> D•34;Slope MuUiplier Tahlr <br /> Land Stope� 0 t 2 3 4 5 6 7 6 R t0 11 12 i3 E4 15 f6 17 1H 1� 20 21 21 23 2e 25 <br /> ! UpSlOpe ?:t 3.00 2.9I 2.83 i.75 2.68 2.�1 2.5�2.d9 2,d2 2.35 1.31 2.26 2dt i.:l Z13 ZG9 1.05 2.03 2,0� LS7 1.55 1.ii I.ii 1.$9 1.81 LE$ <br /> � <br /> ; Berni Rat'0 4:f 1.00 i.85 3.7Q 3.57 3.45 3.3i 3.23 3J2 3.03 2.9d 2.86 2,18 2.T0 1.b1 2.55 3.48 2.d1 2.35 2.29 213 2.I8 2.13 I.flB 2.03 1.48 1.93 <br /> Land5lope� 0 I 2 1 4 5 6 1 8 9 10 It 12 i3 i4 15 t6 17 18 I9 10 21 22 23 2� 15 <br /> [�i'r:OS10� ii:i l.(� 3,09 3.t"r i.36 i.ai 3.S1 3.66 3.80 399 J.11 �1.29 4.»8 d.b4 J.95 524 5.55 5.88 6.1J 6.63 T,W 7,.p 7.43 8.�2 8.93 9.d6 t0,Q2 <br /> 6erniRd[G ��,f a.00 a.�7 a.35 d.�l aJ6 5.CU SZ6 S.S6 5,88 6.25 6,67 1.1J 7.b9 8.29 8.92 9.51 ��.2a 10.4J ti.61 12.�2 t3.t9 i3.99 �a,82 i5.67 i6.4d Il.�l <br /> Select Ups(ope Berm Mu(tiplier <br /> �' based on land slo 2.70 <br /> ( pe): (figure D-34) <br /> D. Catculate Upslope Berm Width:Multip(ier (4.C)X Upslope Mound Height (4.6)=Upslope Berm Width <br /> 2.70 ft X 4.0 ft = 11.0 ft <br /> E. Calculate Drop in Elevo[ion Under Bed:Bed Width (2.B) X Lond Slope (1.D):100=Drop (f[) <br /> 10.0 ft x 12.0 % : too= 1.20 ft <br /> F. Calculate Dawnslope Mound Height:Upslope Hetght (4.8)+Orop in E(evation (4.E)=Downslope Helght <br /> 4.0 ft + 1.20 ft = 5.2 ft <br /> Setect Downslope Berm Mu(tip(fer <br /> �' (based on tand slope): 4.69 (figure D-34) <br /> H.Calculate Downs(ope Berm Width:Multiplier (4.G)X Downslope Height (4.F)=Downs(ope Berm Width <br /> 4.69 x 5.2 ft = 25.0 ft <br /> I. Calculate Minimum Berm Lo Cover Absorption Area:Downslope Absorption�dth (3.6 or 3.C)+4 ft. =ft <br /> 10.0 ft + �4� ft = 14.0 ft <br /> J. Design Downs(ope Berm =greater of 4H and 41: 25.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F)=Endslope Berm Width <br /> 3.00 ft x 5.2 ft = 16.0 ft <br /> M.Calculate AAound Width:Upslope Berm Width(4.D)+g�Width (2.6)+Downslope Berm Width (4.J)=ft <br /> 11.0 ft + 10.0 ft + 25.0 ft = 46.0 ft <br /> N. Calculate Mound Length:Endslope Berm Width (4.L)+Bed Length (2.C)+Endsfope Berm Width (4.L)=ft <br /> 16.0 ft + 63.0 ft + 16.0 ft = 95.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.