14. Cabinetry spec�cations are as follows uniess noted othen�vise: <br /> 1. Refer to Interior Room Schedule of Work for room-by-room description of cabinetry, including <br /> species, style, etc. <br /> 2. Drawers shall be dovetail hardwood construction with Blum Tandem full extension rails on <br /> Blumotion undermount slides. <br /> 3. Blum 135°fully adjustable hinges <br /> 4. Stain color of the cabinets will be selected from fabricator's standard colors. Other colors are <br /> available at an additional cost. <br /> 5. Any selection of handles/knobs/pulls from Amerock is included for every operating door and <br /> drawer, style and finish to be selected. Other handles are available at an additional cost. <br /> 15. The trim (casing, baseboard, crown or other moldings, etc.) is to match the existing as close as <br /> possible using readily available local stock. See paragraph 18 of Important Notice to Customer <br /> below. <br /> 1. Baseboard: paint grade F 232 '/2" x 3 '/4" <br /> 2. Casing : paint grade F112 with 5/4 stool and F112 apron <br /> 3. Crown Molding: Selected from the cabinet makers standard collection [Unless noted <br /> otherwise, new crown moldings shall be installed only at ceiling to cabinet intersections.] <br /> 16. Ceramic tile—materials are standard ceramic tile and installation is standard installation. Any <br /> change from ceramic tile to other tile materials such as natural stone or porcelain may increase the <br /> cost. Any change from standard installation to another design such as diagonal, diamond, clipped <br /> corner, hexagonal, etc. may also increase the cost. Also, any sealing or enhancement of tile, stone <br /> or other product, unless included below, will be an additional charge if requested by the owner. Any <br /> change in material, installation pattern, or material costs above or below the allowance will be. <br /> handled with an AWA. <br /> 17.All painting is to be supervised by Authentic Construction but paid directly by the homeowner to the <br /> subcontractor. At this point we have 3 different painting bids which are for only the items in this base <br /> proposal (no options). <br /> 1. Schoenfelder Painting, Inc.$ 7,331.00 <br /> 2. Painting Perfection $ 9,208.80 <br /> 3. Fillmore Associates, Inc. $16,470.00 <br /> The owner sha/l contract direct/y with the painting subcontractor of their choice and the cost for <br /> this work is not included in this proposal. <br /> 18. Work area shall be sealed off from the rest of the house best as possible and kept neat and clean on <br /> a daily basis. <br /> 19. Up to 16 hours of professional cleaning upon completion of the project is included. Unless <br /> specifically noted otherwise, the cleaning of the exterior of new or existing windows is not included in <br /> the proposal. <br /> SCOPE OF WORK: <br /> Structural <br /> General Demolition & Site Preparations: <br /> 1. Exterior: Demo of the roof down to ceiling joists in the affected areas, removal of affected areas of <br /> the garage including ceiling joists, walls, floors, and electrical (saving the existing garage door, <br /> opener, and track for re-use) exterior siding to be removed in affected areas also. <br /> 2. Interior: Demo of the closet at the existing first floor stairs, ceiling over the dining area to <br /> accommodate the barrel vault, the entire existing mudroom gutted down to the bare studs (salvaging <br />