My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P10851 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
P
>
Pheasant Road
>
2680 Pheasant Road - 21-117-23-23-0020
>
Permits/Inspections
>
2007-P10851 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:03:28 PM
Creation date
6/27/2018 12:32:56 PM
Metadata
Fields
Template:
x Address Old
House Number
2680
Street Name
Pheasant
Street Type
Road
Address
2680 Pheasant Road
Document Type
Permits/Inspections
PIN
2111723230020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ' ������!�� � . � <br /> DESCRIPTION OF PROJECT: <br /> Second floor master suite addition and garage. <br /> General Conditions <br /> Note: Specifications that are stated in the SCOPE OF WORK may supersede the specifications as <br /> written in General Conditions. <br /> 1. Separate writings/drawings constitute a part of this Proposal and are incorporated into this Proposal <br /> by this reference: Matt and Kathy Dolliff A1-A5, X1, and S1 dated 01/29/07 by SLUJPH. Should any <br /> inconsistency exist or arise between a provision of this Proposal and any attached writing or drawing, <br /> the provision of the Proposal shall prevail. If drawings are included with this document, a signature <br /> will be required on this Proposal and on Authentic Construction's copy of those drawings to indicate <br /> that they have been reviewed and approved. <br /> 2. Abbreviations Glossarv. Although we have omitted the majority of construction term abbreviations in <br /> this proposal, we continue to make use of a few common construction abbreviations. They are as <br /> follows: <br /> 1. PSY: per square yard <br /> 2. OC: on center[spacing] <br /> 3. SF: square feet <br /> 4. PSF: per square foot <br /> 5. OSB: oriented strand board <br /> 3. All permits as required. <br /> 4. Items to be added, deleted, or any clarifications will be handled with an Additional Work Authorization <br /> (AWA). See paragraph 2 of Important Notice to Customer below. <br /> 5. Owner to remove all personal items as necessary to perform the work from each area scheduled for <br /> renovations prior to commencement of work. <br /> 1. Areas and items specified to be demolished will not be salvaged unless previously agreed <br /> upon and noted herein. <br /> 2. In the event that there are items to be saved, they shall be clearly marked prior to the first day <br /> of work and discussed at the preconstruction walkthrough. <br /> 6. Engineering for this project will be provided by the supplier/manufacturer of the wood framing <br /> materials, such as the lumber yard, unless specifically stated otherwise. <br /> 7. Dumpster/landfill charges included. All debris will be disposed of off site unless otherwise stated <br /> below. See paragraph 9 & 12 of Important Notice to Customer below. <br /> 8. A portable toilet facility will be on site during construction. <br /> 9. Note: Electrical, if described below, is the electrical as it will be at completion of project and may <br /> include existing circuits and devices. <br /> 10. Windows will be Marvin wood ultimate double hung, IowE II glass with argon gas, 6 9/16 jambs, clad <br /> exterior. <br /> 11. Doors listed below are maple 2 panel unless otherwise stated below. Doors will be bored for <br /> standard lockset and deadbolt; mortise or other special bore will be an additional charge and will be <br /> handled with an AWA. <br /> 12. Door hardware shall be installed at each new interior door and be Provided with a sum total <br /> allowance of$ 100.00 for all said doors. <br /> 13. Install drywall is to install '/z" on the walls, taped, sanded, and prepared for paint and 5/8" on the <br /> ceiling, taped, sanded, fogged, and prepared for primer with a skim coating. <br />
The URL can be used to link to this page
Your browser does not support the video tag.