My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00950 - detached garage
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road North
>
030 Orono Orchard Road North - 35-118-23-33-0037
>
Permits/Inspections
>
2016-00950 - detached garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:40 PM
Creation date
6/6/2018 1:06:54 PM
Metadata
Fields
Template:
x Address Old
House Number
30
Street Name
Orono Orchard
Street Type
Road
Street Direction
North
Address
30 Orono Orchard Road North
Document Type
Permits/Inspections
PIN
3511823330037
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ' Roger Peitso <br /> Building Official <br /> City of Orono <br /> Phone:952-249-4600 <br /> Direct:952-249-4625 <br /> Email: rpeitso@ci.orono.mn.us <br /> Fax: 952-249-4616 � <br /> <image001.jpg> <br /> Sec. 58-47.- Building permit applications. <br /> (a) New residence. No building permit shall be issued for any new building that will be connected to an <br /> ISTS until a site evaluation and design is approved by the on-site systems manager. The site <br /> evaluation must include the identification of both primary and alternate drainfield sites suitable for a <br /> minimum of a five-bedroom residence. If the building will be connected to an existing system, a site <br /> evaluation and design must be approved by the city, including the existing system specifications and <br /> a future site meeting the provisions of this article. A new residence must be connected to an ISTS <br /> meeting the definition of a code system. <br /> (b) Required upgrade or replacement A sewage treatment system not meeting the requirements of <br /> Minnesota Rules Chapter 7080, as amended, or the requirements of this article, whichever is more <br /> restrictive, must be upgraded, at a minimum, at any time a building permit is required for any <br /> improvements on, or use of, the property, subject to the following: <br /> (1) Any such system for which the city has previously issued orders requiring upgrade or replacement <br /> of the system by December 31, 2007, shall not be subject to this requirement until January 1, <br /> 2008. <br /> (2) Any such system forwhich the city has previously issued orders requiring upgrade or replacement <br /> of the system by December 31, 2010, shall not be subject to this requirement until January 1, <br /> 2011. <br /> (3) Regardless whether previous upgrade or replacement orders have been issued, this upgrade or <br /> replacement requirement shall not apply when said building permit is for regular maintenance or <br /> upkeep including but not limited to replacement of inechanical equipment such as air conditioning, <br /> furnaces, water heaters, or water softeners, or for re-roofing, re-siding or window replacement. <br /> (c) Construction of additional bedrooms or construction including water-using appliances that will increase <br /> the sewage flow into an /STS. A building permit shall not be issued until the city confirms that the <br /> existing ISTS is compliant and of adequate size to treat the sewage flow from the building and that a <br /> future drainfield site is designed and preserved. If the existing ISTS must be repaired or replaced, an <br /> ISTS design for both the existing ISTS and a future drainfield site must be approved before issuing a <br /> building permit. If expansion or replacement of the ISTS is required, the ISTS must be installed and <br /> inspected before a certificate of occupancy shall be issued for the construction. Failure to identify <br /> satisfactory drainfield sites for the proposed sewage flow for use now as well as a future site shall <br /> result in the denial of the building permit application. <br /> {d} Expansion of an existing building, including decks and patios; construction of an accessory building, <br /> driveway or land a/teration. A future drainfield site must be designed and preserved prior to the <br /> issuance of a building permit for any expansion of an existing building, construction to an accessory <br /> building or driveway or land alteration on a property using an ISTS.A building permit will not be issued <br /> when the proposed work would preclude the use of the only future drainfield site approved by the city. <br /> (Code 1984, § 12.30(4)(F); Ord.No. 100 2nd series, § 4, 2-10-1992; Ord.No. 147 2nd series, § <br /> 8, 5-13-1996; Ord.No. 199 2nd series, § 1(12.30(4)(F)), 5-8-2000; Ord.No. 38 3rd series, § 1, 9- <br /> 24-2007) <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.