My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004442 - repair 3 tanks
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
480 Orono Orchard Rd S - 02-117-23-21-0047
>
Permits/Inspections
>
1992-004442 - repair 3 tanks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:10:34 PM
Creation date
5/23/2018 8:53:22 AM
Metadata
Fields
Template:
Address
Address
480 Orono Orchard Rd S
Document Type
Permits/Inspections
PIN
0211723210047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. <br /> 951 KATYDID LANE <br /> ST. MICHAEL, MN 55376 <br /> 497-3566 <br /> Steven B. Schirmers <br /> June 24 , 1991 <br /> Ted Ham <br /> 480 Orono Orchard Rd . <br /> Caretaker House <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type 1 , three <br /> bedroom home in accordance with the Minnesota Pollution Control <br /> Agency Chapter 7080 and local ordinances. <br /> The soils on this site are typical of SCS soils mapped - Kkc - Kilkenny <br /> loam. A seasonally high water table was located at 12" & 18" , <br /> (mottled soil) . This site has an existing failing system with <br /> effluent surfacing. This site has strong clay soils with a high <br /> seasonally high water table. Soil Borings completed east of the <br /> barn at the base of the slope are fill soils . North of the house <br /> are also fill & excavated soils , these are not suitable for an <br /> On-Site Sewage Treatment System. Northwest of the main house , <br /> original soil was found aid is suitable for an On-Site Sewage <br /> Treatment System but dueto the seasonally high water table, <br /> a Pressurized Mound System will need to be installed. Slopes <br /> exceed the 6% allowed by the City of Orono and are 9% to 10% , <br /> this will need to be approved by City Officials. <br /> The soils at a depth of 12" have a percolation rate averaging 13 . 3 <br /> min/inch and are adequate for treating septic effluent. <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area . <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber . The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over , just break up the sod, be sure <br /> not to over work. <br /> CONT ' D <br /> Soil and Percolation Tests <br /> Septic System Design <br />
The URL can be used to link to this page
Your browser does not support the video tag.