My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004442 - repair 3 tanks
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
480 Orono Orchard Rd S - 02-117-23-21-0047
>
Permits/Inspections
>
1992-004442 - repair 3 tanks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:10:34 PM
Creation date
5/23/2018 8:53:22 AM
Metadata
Fields
Template:
Address
Address
480 Orono Orchard Rd S
Document Type
Permits/Inspections
PIN
0211723210047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , <br /> ,, ,,,,, 41 <br /> ,, r.,,„ ." CITY OF ORONO Permit # <br /> a rn <br /> '� `)iii). E IC SYSTEM APPROVAL Fee $ <br /> k ,. s % Entered By <br /> The General Contractor will be given a copy of this report and is <br /> responsible for its distribution to all sub-contractors. SEPTIC SYSTEM <br /> DESIGN IS NOT CONSIDERED AS APPROVED UNLESS THIS SHEET IS ATTACHED. <br /> LOCATION: U?O •,ry •I A r b./P, `>• <br /> GENERAL CONTRACTOR: --PHONE: <br /> SEPTIC CONTRACTOR: PHONE: <br /> Thi OWNER: hail' pr\ — ki)(P5f'1)J1zi : al) '')lIt''(' PHONE: 2(73-223c) <br /> f. APPROVED <br /> 0 CONDITIONALLY APPROVED: (Note Changes Below) J <br /> COMMENTS: Tii/71-.5" /O c� j <br /> ?I -/aV y /- /Jal 1441 p O 4rrrl <br /> J <br /> bralhiaid ,- <br /> /id i `/l ' , -4. A ' - & 757' . <br /> sn 'xer cir, go-31 <br /> 1l, /o [/ TL l ( 2 "F�,��. ►' , Ii' — -f <br /> riPlf) cor, CiplIf9r ,.S/ - r.,, Ate) / l l ,4� <br /> aNOTICE TO pproval of INSTALLERS: <br /> Inspector (473-7357).s <br /> 473 7357). Call for piinsp Inspections 24 hour.slans and pinshave must prior <br /> advance. <br /> NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br /> prior to and after system installation to avoid compaction of the natural soil. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must <br /> remain in place until final site grading. Approval to pour footings will not be granted <br /> until the Inspections Department has verified that primary and alternate sites are <br /> adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed <br /> within 20' of tested drainfield sites either before or after system construction. This <br /> applies to the lot you are working on and all adjacent lots. You could be held liable for <br /> damaging sites on neighboring lots. <br /> VEHICULAR TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE. <br /> Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br /> Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br /> 943_1/ y .�D/Lf.�� <br /> Byt of Orono <br /> Date Approved � Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.