Laserfiche WebLink
160 <br /> Principal Dwelling Demolition Permit <br /> a ZONING DISCLOSURE & DECLARATION <br /> To the property owner: Demolition of the principal dwelling structure on a property may <br /> automatically terminate certain rights which may have accrued to the property by virtue of the continued existence of <br /> that building. <br /> • Rebuilding on a substandard lot of record(i.e.a lot that does not meet the zoning district required lot area or width <br /> standards) will, with few exceptions, require variance approval by the City Council, and such approval is neither <br /> automatic nor guaranteed but requires that a hardship be demonstrated. <br /> • Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, lot <br /> coverage by structures, hardcover(impervious surface), height limits, etc. <br /> • Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage treatment <br /> system is mandatory. <br /> • Unless specifically approved by the City,all accessory structures must be removed at the time of principal dwelling <br /> demolition.This also applies to seasonal and permanent docks,which may not be re-installed until a new principal <br /> dwelling has reached the framing stage. <br /> The following information is presented for the purposes of advising the property owner of the implications of removal of <br /> the principal dwelling on the property: <br /> 1. Property Address: 190 Orono Orchard Road PIN# 02-117-23-21-0009 <br /> Required Lot Area: 2 acres Required Lot Width 200' <br /> 2. Zoning District: RR-1B Actual Lot Area 1.63 acres* Actual Lot Width ±130'* <br /> *According to Hennepin County <br /> Lot area varia is not required. Lot width varians not required. <br /> 3. Required Setbacks: Front 50' Rear 50' <br /> Lakeshore Lot: Lake(Front) NA Street(Rear) NA Side (North): 50' Street/Side(South): 50' <br /> Average Lakeshore Setback: must be met is not_pplicabl) <br /> 4. Lot Coverage by Structure limited to 15%of lot area does not apply(lot area > 2 acres) <br /> 5. Hardcover limitations: are applicable are not applicable. 0-75'zone= 0% allowed <br /> 75-250'zone= 25% allowed 250-500'zone= 30% allowed 500-1000'zone= 35%allowed <br /> 6. X Municipal sewer is available. <br /> Municipal sewer is not available; on-site system testing and design must be provided confirming that two <br /> conforming drainfield sites are available. <br /> 7. X Wetland(s) present. Wetland(s) are classified as "Manage 1 and 3". A Manage 1 wetland requires a 35' <br /> buffer from the edge of wetland and a 20'structure setback from the buffer. A Manage 3 wetland requires a 16.5' buffer <br /> from the edge of the wetland and a 20' structure setback from the buffer is required. **Talk to Planning Department <br /> Staff for additional requirements. <br /> The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials <br /> Property Owner's Signature Date -7-V110 <br /> Form ZDD—Revised 5-23-05 (Original: Street File; Copy: Property Owner) <br /> wastreet files\orono orchard rd1190\zoning disclosure and declaration form <br />