Laserfiche WebLink
r ti <br /> �o�a PRINCIPAL STRUCTURE DEMOLITION PERMIT <br /> ZONING DISCLOSURE & DECLARATION <br /> At To the property owner: Demolition of the principal dwelling structure on a property may <br /> �kESHOa�G automatically terminate certain rights which may have accrued to the property by virtue of the <br /> continued existence of that building. This means you may give up some or all of the zoning rights <br /> currently associated with the principal structure (setbacks, hardcover, size of building, etc) with its removal. <br /> • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot area or width <br /> standards) may, with few exceptions, require variance approval by the City Council, and such approval is neither <br /> automatic nor guaranteed but requires that a practical difficulty be demonstrated. <br /> • Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, and <br /> building footprint, hardcover(impervious surface), &height limitations, etc. <br /> • Where municipal sewer is not available, provision of two (2) conforming on-site septic treatment sites is mandatory <br /> for a new dwelling. <br /> • Unless specifically approved by the City, all seasonal and permanent docks must be removed at the time of <br /> principal dwelling demolition. They may not be re-installed until a new principal dwelling has reached the <br /> framing stage. <br /> The following information is presented for the purposes of advising the property owner of the implications of removal of <br /> the principal dwelling on the property: <br /> 1. Property Address: 190 Orono Orchard Road S PID# 02-117-23-21-0009 <br /> 2. Zoning District: RR-1B Required Lot Area: 2 acres Required Lot Width: 200' <br /> Shoreland? y0 N Actual Lot Area: 1.54 Actual Lot Width: ±130' <br /> Lot area variance is is not r:•uired.* Lot width variance is . is no r:quired.* <br /> *Pursuant to City Code Section 78-72(b)(2)attached. <br /> SideSide Street <br /> 3. Required Setbacks: Front 50' Rear 50' (North) 50' (South) 50' <br /> Average Lakeshore Setback: must be m - is not applicable. <br /> 4. Massing &Lot Coverage by Structures limited to 15%of lot are / does not apply(lot area > 2 acres) <br /> 5. Hardcover limitation : Are NOT applicable or-Are applicable. <br /> 6. Municipal sewer is available. <br /> 7. Wetlands are present and a 35-foot setback is required. If the wetland is within 150 feet of the project a wetland <br /> delineation may be required for setback determination. Minnehaha Creek Watershed District approval is required prior to <br /> issuance of permits from the City of Orono. **Contact Planning Department Staff for additional information. <br /> The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials <br /> ei <br /> Property Owner's Signature Date (94,0W1 <br /> (Original: Street File; Copy: Property Owner) <br /> Created: April 2013 <br />