My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
items needing addressing-2015-01398
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
190 Orono Orchard Road South - 02-117-23-21-0009
>
Correspondence
>
items needing addressing-2015-01398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:01 PM
Creation date
5/18/2018 2:05:42 PM
Metadata
Fields
Template:
x Address Old
House Number
190
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
190 Orono Orchard Rd S
Document Type
Correspondence
PIN
0211723210009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please contact me with any questions on this review. <br /> Thank you. <br /> Melanie <br /> Melanie Curtis <br /> 21'952.249.4627 ®mcurtis@ci.orono.mn.us <br /> From:Adam Edwards <br /> Sent:Tuesday, September 20, 2016 1:38 PM <br /> To: Melanie Curtis<MCurtis@ci.orono.mn.us>; Christine Mattson <CMattson@ci.orono.mn.us> <br /> Cc:Jeremy Barnhart<ibarnhart@ci.orono.mn.us> <br /> Subject: RE: 190 Orono Orchard Road/#2015-01398 <br /> Melanie, <br /> I've reviewed the as built and conducted a site visit. I offer the following comments: <br /> 1. The disturbed area of the ROW should be vegetated. (see Photo) <br /> <image001.jpg> <br /> 2. Vegetation in the Buffer has not germinated yet, if planted. <br /> <image002.jpg> <br /> 3. The retaining wall/walls in next to the patio exceed 4ft in height. I could not find a copy of the <br /> engineered design for the walls signed by a licensed engineer as required by the City. <br /> <image003.jpg> <br /> 4. The drainage structure on the property is overgrown and failing. It needs to be cleared. (Note- I had <br /> offered a several occasions to do this during construction. Just needed the builder to call me and let me <br /> know a good time. It will now be very difficult for the city to access the site without tearing up the new <br /> sod). If there is an easement over this structure it should be shown on the survey. <br /> <image004.jpg> <br /> 5. Contractor should complete a final cleaning of the street to remove dirt and construction debris. <br /> <image005.jpg> <br /> 6. Not all of the trees on the approved plan appear to have been planted. To the east of the driveway <br /> the plan called for 4 coniferous and 3 deciduous. There are 3 coniferous and 4 deciduous. To the west <br /> of the driveway the plan called for 4 coniferous. Only one coniferous was planted. <br /> Adam <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.