Laserfiche WebLink
, ,,*4, ,.. . ItP.„ *= ,t. . ' .f.- 0,,:, ' ' .. — :c.t- ,...!..., „..., . .. <br /> �„�_ _ <br /> l — .*. , int ... -iv altv - .a, 414 . . <br /> ire <br /> -i 1 <br /> d 1 <br /> .• ". _ _ <br /> at <br /> 3' <br /> Ty tom, <br /> > � <br /> Sent from my 'Phone <br /> On Sep 20, 2016, at 2:17 PM, Melanie Curtis<MCurtis@ci.orono.mn.us>wrote: <br /> Gentlemen <br /> Our engineer reviewed the as-built survey and conducted a site inspection today at 190 Orono Orchard <br /> Road. Please see his detailed comments below. The identified issues must be addressed prior to issuance <br /> of a final Certificate of Occupancy for the new home. Further, all exposed soil should be vegetated and <br /> stabilized (established) prior to the final CO. <br /> It appears the items needing resolution described in detail below are as follows: <br /> 1. Vegetation of the disturbed right-of-way area <br /> 2. Buffer vegetation <br /> 3. Engineered design for retaining walls <br /> 4. Drainage structure maintenance <br /> 5. Street cleaning <br /> 6. Tree planting <br /> Regarding the drainage structure, please provide clarification if a utility/drainage easement exists over <br /> this area. This easement would be included in the title work and, if it exists, should be reflected on the <br /> survey. <br /> I have also attached the builder acknowledgement form initialed at the time of the permit issuance. I <br /> highlighted the notes regarding the drainage inlet and retaining walls. <br /> 4 <br />