My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01392 - detached garage
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road North
>
105 Orono Orchard Road North - 35-118-23-33-0003
>
Permits/Inspections
>
2014-01392 - detached garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:22 PM
Creation date
5/10/2018 12:51:11 PM
Metadata
Fields
Template:
x Address Old
House Number
105
Street Name
Orono Orchard
Street Type
Road
Street Direction
North
Address
105 Orono Orchard Road North
Document Type
Permits/Inspections
PIN
3511823330003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Andrew Mack <br /> From: Andrew Mack <br /> Sent: Monday, December 22, 2014 11:08 AM <br /> To: 'johnv@gordon-james.com' <br /> Subject: Permit Application No: 2014-1392 - 105 Orono Orchard Rd. N <br /> Attachments: Escrow Agreement- Building Permit w Erosion Control_2014.pdf; Escrow Agreement- <br /> Building Permit w Erosion Control_2014 (Exhibit A).pdf <br /> Dear John, <br /> Our office has completed the initial review of your building permit application for the above property. I have a number of <br /> items needed from you and additional information prior to approval of the permit. The Planning &Zoning review <br /> comments are as follows: <br /> 1. Two full sets of plans and survey information is needed. Only 1 copy was submitted and the second set becomes <br /> the job site information once plans are approved for the permit. <br /> 2. We require that you submit separate hard cover calculation sheets for both the existing and proposed hard cover <br /> for the property. <br /> 3. The architectural building drawings (elevation and building section sheets in particular) do not appear to have the <br /> correct scale and therefore I cannot determine the building height by normal calculations. Please resubmit these <br /> drawings to a correct scale. <br /> 4. I need to verify there are no more than 3 bedrooms in the dwelling with regard to the septic capacity for the site. I <br /> was unable to determine this information from the prior building permit for the property on record with the City of <br /> Orono. A restrictive condition will also be placed upon the building permit which prohibits connection of any <br /> plumbing in the new garage to the septic system, unless this is in fact the intent. If so, another step in the process <br /> will be required. We have two ways to accomplish this. 1. I go out to the property and verify this by conducting a <br /> walkthrough of the dwelling. 2. The owner of the property writes a letter to accompany the application which <br /> states that there exists a total of no more than 3 bedrooms for the dwelling. <br /> 5. Please submit the original signatures on the building permit application along with the updated information. <br /> Engineering comments: <br /> 1. Silt fence should be indicated on the plan immediately down gradient from proposed work where land will be <br /> disturbed. The silt fence should be installed by the Contractor and inspected by the City prior to any land <br /> disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. <br /> 2. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering oversight. <br /> The financial security is intended to provide protection in the event that it becomes necessary for the City to install <br /> or maintain erosion and sediment control within the project area and covers the cost of vegetation re- <br /> establishment if the applicant is unable to follow through with the conditions of approval. Attached please find the <br /> required escrow agreement which must be signed by the land owner, or one of them may just stop by the city <br /> hall and sign them. The fee may be paid by either the land owner or the General Contractor. <br /> 3. The applicant is required to separately obtain Minnehaha Creek Watershed District(MCWD) approval and <br /> permitting for their Erosion Control rule. Please submit this information to their office now if you have not already <br /> done so. A copy of the approved permit or confirmation that no permit is required must be provided to our <br /> office prior to any land altering activities and issuance of the building permit. <br /> Please contact me directly should you have any further questions regarding this project. <br /> Best Regards, <br /> Andrew Mack, AICP <br /> X41; Community Development Director <br /> City of Orono Minnesota <br /> ' Direct 952.249.4626 <br /> amack ct ci.orono.mn.us <br /> www.ci.orono.mn.us <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.