Laserfiche WebLink
A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must_be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> If the tanks have less than 2' of cover, the lids, risers & maintenance hole covers must <br /> be insulated to a value of R10. <br /> Cleanouts for each later must be installed & be accessible from finish grade in an <br /> irrigation box with a ball valve. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> If a garbage disposal is used, an effluent screen will be needed in the 2nd tank. <br /> Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should be marked off before construction. This <br /> Design is not valid & the system will need to be relocated if failure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> MANAGEMENT PLANS: <br /> The tanks need to be pumped every 2 years. Check with your pumper to set up a <br /> schedule. <br /> System inspected for wet areas by owner & or Inspector as determined by the local unit <br /> of government. <br /> Any other requirements as determined by the local unit of government <br /> 2 <br />