Laserfiche WebLink
S-P TESTING, INC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (763) 497-3566 <br /> FAX (763)-497-5011 <br /> State License #394 <br /> My OF ORONO <br /> SEPTIC2t2 <br /> INSPEC •I <br /> Revised August 15, 2008 DATE ' E' ERMIT NO. <br /> W-' APPROVED AS SUBMITTED <br /> IIIII APPROVED WITH CORRECTIONS AS NOTED <br /> NI NOT APPROVED-CORRECT&RESUBMIT <br /> These comments are for your information. Al!work shall be demRon & Karen Ridgeway in full compliance with all applicable septic and zoning code. ORONO <br /> 1350 Orono Oaks Dr. Requirements including items not specifically noted in this review. COP <br /> Orono, Henn. Co.,MN KEEP THIS PLAN SET ON SITE AT ALL TIMES <br /> The Revised design dated October 12, 2005 is being revised due to construction <br /> equipment traveling over the proposed treatment area which caused damage to the <br /> soil. <br /> This site has an existing on-site sewage treatment system which was classified as non- <br /> compliant by the City of Orono. <br /> This on-site sewage treatment system is designed for a Type 1, four bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are a loam. The periodically saturated soils were located at 26" to <br /> 40" (redox features). Due to the seasonally saturated soils, a Pressurized Mound <br /> System will need to be installed on a 12% slope to treat septic effluent. The bottom of <br /> the rock must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of 4.2 mpi. ORONO COPY <br /> The existing tank may be used if water tight. <br /> The soil 15' downslope of the mound must be protected. This area has been driven on <br /> & should be roughened up at the same time as the mound construction. The access <br /> road to the back of the property must be 20' downslope of the toe of the mound. By <br /> saving this area, allows movement of water downslope & allows space to add sand to <br /> the downslope toe of the mound if seepage would occur. <br /> ORONO COPY 1 , <br /> • 111111111111111111$111861 <br />