Laserfiche WebLink
PRESSURE DISTRIBUTIQN SYSTEM END,PERFORntIOti n .. <br /> ;,_ . I <br /> 1. Select number of perforated laterals STopsoil ` <br /> Leomy So„a lnr•, •• •.. <br /> 2. Select perforation spacing = 3_ feet • • "I <br /> 3. Since perforations should not be placed closer than 1 ft. to �u --- HSM',•_ ,, <br /> the edge of the rock layer (see diagram), subtract 2 ft. from Clean Sand rove, ''''' <br /> the rock layer length. <br /> Original Soil Pope,I, <br /> . 5. Oelote Fianna ;nn,l I n,1•• <br /> Rock layer length - 2 ft. = ', feet <br /> TABLE.OF FERFORAI R 1:\* : '1,., <br /> •1. Determine the number of spaces between perforations. <br /> Head Perforation.1:,,,•,. <br /> Divide the length above by perforation spacing and round -----------, <br /> down to nearest whole number. /,, <br /> 1.oa 41111110 <br /> Length pert. spacing = > ", ft. _ ft. = 1 ( space' 20 `.h`' <br /> (#3) (#2) 2.0h ; b,. <br /> 5. Number of perforations is equal to one plus the number of 3.0 0.9" <br /> 4.0 1.13 • <br /> perforation spaces . 5.0 , ,h <br /> �� spaces + 1 = G aUse 1.0 foot of head feu I. .,,I,., ,,,.,..• I <br /> p ' erforations per lateral bUse 2.0 feet of head f,Ir nuu•t ,,:.:!,:I;; 1:,,•:,'• i <br /> 6. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. <br /> Table 2 <br /> r <br /> I perforations Maximum allowable number of touter inch perfnrli , t, r <br /> laterals X perfs/lateral J p lateral to guarantee<10%Uischart e,arietiun <br /> pt'=�r.tlnn,p.eing 1.25 inch ` 1 - 'H. is;,- <br /> 7. Determine required flow rate by multiplying c.5 -- - - <br /> 2.5 I 14 <br /> number of perforations by flow per perforation 3.0 I 13 C- <br /> 3.3 12 <br /> 4.0 I 1 <br /> 5.0.l <br /> 10 • <br /> pears x Bpa,/pert= " gpm. -- <br /> 8. If laterals are connected to header pipe as shown on upper <br /> example,select minimum required lateral diameter from <br /> table 2; enter table with perforation spacing and number <br /> of perforations per lateral. Select minimum diameter for . <br /> perforated lateral = 2 inches • <br /> 9. If perforated lateral system is attached to manifold piper jar <br /> the center, as in lower example, perforated lateral length and <br /> number of perforations per.lateral will be approximately one .,._..Y <br /> half of that in # 6. Using these values, select minimum >�• " ' t'Y -. <br /> diameter for perforated lateral from table 2 �; y:.�;• ;.._,_ <br /> perforated lateral = \ Y-1 inches <br />