My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005688 - septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
745 Orchard Park Road - 31-118-23-11-0003
>
Septic
>
1993-005688 - septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:19 PM
Creation date
5/1/2018 1:49:38 PM
Metadata
Fields
Template:
x Address Old
House Number
745
Street Name
Orchard Park
Street Type
Road
Address
745 Orchard Park Road
Document Type
Septic
PIN
3111823110003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PUMP SELECTION PROCEDURE <br /> END PERFORATION OF A PERFORATED LATER..L <br /> A. Determine pump capacity: celes Carer <br /> Gravity Distribution ;,a , 11` .; . <br /> 1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of - -. • - <br /> Laon,sow layer ••Leyer al 6aFobK(x.17 <br /> water use rate. Ywit%m ele.min ptoe l �>^re <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 ir,�rT r.71p r �i Hrl:.- tilted Naruomeu, <br /> Isle bap Nea Top <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. „a,,•�1e _ leSep• <br /> • lelel Rat ute, <br /> A <br /> PrfreU.,s located at <br /> Pressure Distibution _ cepa Seoe Lever lettere el Labral <br /> 3. a. Select number of perforated latgral ls - <br /> b. Select perforation spacing= 1j feet.3 <br /> Orlon Sell Pearriv Susilied <br /> Wlre Pisan/Sand Layer <br /> C. Sum raft 2 ft.from the rock layer length. <br /> Rock layerleaatk-2 ft._ feet. <br /> d. Determine the number of spaces between perforations. TABLE OF PERFORATION DISCHARGES IN Cl' <br /> Length perf.spacing=Sa ft.+ 3 ft.= spaces Head Perforation diameter(inches) <br /> e. iq- spaces+ 1 = I°l perforations/lateral <br /> t. Multiply perforations per lateral bY number of laterals4o 'SII '/. <br /> et total yy11mbcrr of perforations. ,,��t,,, x liIr„= S/ perforations. 1.0a 0.56 0.74 <br /> g. ,, x =-.-i$pm• 13 0.69 0.90 <br /> 2.0b 0.80 1.04 <br /> SELECTED PUMP CAPACITY 32 gpm 2.5 0.89 1.17 <br /> 3.0 0.98 1.28 <br /> 4.0 1.13 1.47 <br /> . B. Determine head requirements: 5.0 1.26 1.65 <br /> 1. Elevation difference between pump and point of discharge. <br /> aUse 1.0 foot of head for residential systems. <br /> 7 feet bUse 2.0 feet of head for other establishments <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> , .'5 feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe Length <br /> Read friction loss in feet per 100 feet from table. <br /> Point of Dischz. <br /> F.L. =7,e ft./100 ft of pipe <br /> b. Determine total pipe length from pump to discharge Elevation DiffcTcncc <br /> point. Add 25 percent to pipe length for fittingpip . <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F 18b <br /> 15- x 1.25= Z2 6 feet <br /> c. Calculate total friction loss bymultiplying1.5 inch 2.0 inch 3.0 inch <br /> Wm Friction loos per too rt of pipe <br /> friction loss in ft/100 ft by equivalent pipe length ` + 10 0.69 0.20 <br /> Total friction loss= '17 0 x I .0(--) +100= �• . feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 7 + 5 + (4, `- 20 2.47 0.73 0.11 <br /> 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> TOTAL HEAD g7 feet 4011.072.64 0.39 <br /> 455 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> C. Pump selection 55 4.76 0.82 <br /> 1. A pump must be selected to deliver at least <br /> -•', gpm (Step A) with at least _feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.