Laserfiche WebLink
I <br /> SECTION 4 <br /> I Open Door Installation <br /> I <br /> Overhead Door Endwall Sheeting Assembly <br /> I <br /> 1 <br /> „,, 1,4_,,c % % %,, <br /> Ak <br /> ' 4\.;1144 1 , 111\ <br /> 1, 11 <br /> / ,��'• moo <br /> I 4F 1110•16 <br /> IFigure 4-26 <br /> Figure 4-23 ,II <br /> I <br /> Figure 4-25 <br /> ......-/ Figure 4-24 —1 __ <br /> Door jamb <br /> I Install open endwall sheeting as shown in Figures 4-23 through 4-26. <br /> Sheeting and corner trim should be installed as shown in Figure 4-23. t <br /> Trim sheeting to fit along the eave to the peak. <br /> I Install sheeting above the header on top of the drip cap (Figure 4-26). .• .• <br /> Fasten sheeting and trim to the bottom girt(Figure 4-24). lide the — <br /> —....2-- <br /> sheeting in to the"C”-trim at the door jamb as shown in Figu 5. Girt <br /> IFigure 4-25 <br /> Corner <br /> Iry Sheeting <br /> -----b. Sheeting <br /> Girt <br /> 1 <br /> 1 Girt '_ St el header <br /> LI= <br /> 8 J <br /> J I I Splash <br /> board <br /> I <br /> ..e___Flush for the 2x4 girls ConcreteAI 2 I� <br /> or 2"for 2x6 girls Drip cap—�� <br /> Figure 4-23 Figure 4-24 Figure 4-26 <br /> I <br /> COD-96 25 0 Miracle Steel Structures,Inc. 1996. <br />