Laserfiche WebLink
I <br /> SECTION 4 <br /> I Open Endwall Assembly <br /> I <br /> Roof Sheeting and Trim Assembly <br /> I <br /> .► <br /> ilk � Figure 4-22 ' ��� <br /> �,. X1111%-- <br /> < <br /> . . <br /> '1; 11�- Figure 4-21 i . <br /> 1 <br /> M <br /> 1 ll � <br /> -1��i.-,� Figure 4-20 <br /> I <br /> Install base molding on the bottom girt and splash <br /> I board as shown in Figure 4-20. Install post trim and <br /> "C"metal trim on sides of door jamb columns as <br /> shown in Figure 4-21. Install post trim on header and <br /> drip cap as shown in Figure 422. <br /> I <br /> IGirt I R <br /> N.17I `Door jamb <br /> I/ \ Steel header <br /> ,14 <br /> IPost trim �---_Screw Screw <br /> Base i <br /> molding <br /> . .• • t 2 <br /> .>„ X <br /> 2 ,ii <br /> Splash dmetal trim �/ <br /> I <br /> %`.► & Girt Post trim Drip cap <br /> Figure 4-20 Figure 4-21 Figure 4-22 <br /> I <br /> COD-96 24 ©Miracle Steel Structures,Inc. 1996. <br />