Laserfiche WebLink
I <br /> SECTION 2 <br /> I Truss Assembly <br /> I <br /> The Second Truss Frame. <br /> I <br /> ,441 'Nil%p.,_.'.1114 FA'' <br /> 111 <br /> ‘4411‘ wet.M <br /> '� i► Ai <br /> 401 <br /> 1I II; <br /> * <br /> Figure�� Figure 2-5 <br /> !I/'I •V <br /> I 1) !, <br /> . <br /> Figure 2-4 <br /> ti \ <br /> I II <br /> 101 <br /> \� <br /> 4 \ <br /> After the first frame is plumb and securely guyed and 'Y <br /> braced, the second frame can be erected using the <br /> I same method. Pre-cut a fewpurlins and girts ander <br /> ,���'f <br /> install them between the first and second frames in "• <br /> order to tie the frames together, as illustrated above Metal purlin \ \ <br /> I and in Figure 2-4 and Figure 2-5. Fasten these support and girt clips <br /> purlins and girts in metal clips on the truss using <br /> washerless wood grip screws. Figure 2-4 <br /> IBe sure to cut all girts and purlins properly, so that This purlin/girt is added as <br /> each member extends only one-half (1/2) way into the support for the third truss. <br /> metal purlin and girt clips installed on each truss Purlin or Girt <br /> I (Figure 2-5). All remaining trusses can be tied together — e-, e— <br /> with support purlins and gins using the same method. \ u . ._--„...-/ <br /> I The truss stabilizers shown in Figure 2-5 are bolted to <br /> prepositioned tabs on the trusses with the supplied <br /> 3/8" bolts and fastened to the purlins and girts with <br /> I two washerless wood grip screws. Position the truss <br /> stabilizers at an approximate 45° degree angle from <br /> the truss to the purlin or girt located directly above <br /> Truss stabilizers <br /> i and parallel to the prepositioned tab on the truss. <br /> Figure 2-5 <br /> ICOD-96 8 ©Miracle Steel Structures, Inc. 1996. <br />