My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04186 - accessory structure
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
740 Orchard Park Road - 32-118-23-22-0007
>
Permits/Inspections
>
2001-P04186 - accessory structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:34 PM
Creation date
5/1/2018 1:04:53 PM
Metadata
Fields
Template:
x Address Old
House Number
740
Street Name
Orchard Park
Street Type
Road
Address
740 Orchard Park Road
Document Type
Permits/Inspections
PIN
3211823220007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 2 <br /> I Truss Assembly <br /> 111 <br /> Using a Crane <br /> S <br /> _,,,-4„,,,,2, -.... _ ___ __ _ _.—,--?1, c ..,iiif <br /> ''.;'---- -- -------.,-.irixk,Ifk.'Vegie:V I Illk - <br /> :-4p A ___,I., im.....„-- - <br /> i 4r 7,,, i,,,,to, ifiror f• <br /> ' 1 -'1/ * r • <br /> I i izi) Ai/ <br /> IWI Jo <br /> oi <br /> I ; II�;l 4.i. <br /> I , JIII 1 rl 1 r,,oci:)% II ir ,,M ii• %.,......ki.m., <br /> z 1 <br /> J1( p} <br /> I. <br /> IFigure 2-B <br /> 1 1. Layout the two column legs and two roof sections tightening the base anchor bolts, eave bolts and <br /> of the truss on a flat work surface near the pier peak bolts using the"turn of the nut"method. <br /> I or foundation location where it is to be installed. 3. Properly and safely brace erected truss <br /> Bolt the roof sections together using supplied assembly by use of guy wires and braces. <br /> structural bolts. Do not finish tightening the Continue to assemble and erect your second and <br /> I bolts. Place column legs on the anchor bolts and remaining trusses using the same method. <br /> install anchor bolt washers and nuts. Tighten See also page 8,The Second Frame. <br /> securely but not completely to allow for some <br /> give during the bolting of the roof sections. <br /> SPECIAL NOTE: <br /> I See also page 4,The First Frame. You may also use a front end loader, forklift or other <br /> 2. Properly position the crane to lift the assembled heavy equipment to assist in lifting and securing the <br /> I roof section. Lower the spreader bar and fasten roof sections during erection. Some customers also <br /> the bar to the roof section. Carefully lift the roof choose to construct platforms on the back of dump <br /> section and position it to allow for bolting to the trucks or other heavy equipment during the erection <br /> I installed leg columns(Figure 2-6). After proper <br /> bracing or continued crane support, finish phase. If these or other methods are chosen, please <br /> assure they are undertaken in a safe manner. <br /> $ COD-96 7 ®Miracle Steel Structures,Inc. 1996. <br />
The URL can be used to link to this page
Your browser does not support the video tag.