My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04186 - accessory structure
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
740 Orchard Park Road - 32-118-23-22-0007
>
Permits/Inspections
>
2001-P04186 - accessory structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:34 PM
Creation date
5/1/2018 1:04:53 PM
Metadata
Fields
Template:
x Address Old
House Number
740
Street Name
Orchard Park
Street Type
Road
Address
740 Orchard Park Road
Document Type
Permits/Inspections
PIN
3211823220007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 1 <br /> I Construction Considerations <br /> IWhile there are countless types of foundation systems Frost action, soil bearing capacity, loading factors, <br /> you can consider the following four(4)types of building uses, local codes and other factors will help <br /> Ifoundation systems most often used are: drilled pier, determine the best foundation system for you. <br /> vertical pier with spread footing, perimeter wall and NOTE: Remember to refer to your previously <br /> footing and the thick-edged floating slab. <br /> I supplied anchor bolt setting plan and column detail <br /> plan along with this assembly guide during erection. <br /> IAnchor bolts <br /> Anchor bolt template <br /> ■ <br /> I <br /> 0 0� ;� • - 4 . .d <br /> 0 o $ 4A 4 <br /> I , CM%) i , <br /> .4 <br /> 0 splashboard <br /> IAnchor bolts , <br /> Figure 1-1 <br /> I <br /> 1 During the installation of your foundation, an easy way SPECIAL NOTE: <br /> to place your truss anchor bolts is with the use of a 1) Storage instructions are contained in your <br /> I truss template made of plywood as illustrated above. sheeting and roofing package. Follow these <br /> Secure plywood template to splashboard. Drill on the instructions carefully if you decide to store your <br /> template and locate the diameter holes for anchor building rather than to erect it immediately. <br /> I bolts according to anchor bolt setting plan <br /> 2) After cutting or drilling your sheeting, remember <br /> Install four(4) 1/2"anchor bolts, washers, and nuts to immediately remove any shavings in order to <br /> I into splashboard and two (2) anchor bolts into the prevent surface damage. <br /> template prior to concrete pour. Refer to anchor bolt <br /> setting plan for template anchor bolt size. Assure that 3) As in all construction projects, make sure that <br /> the two (2)template anchor bolts extend at least 2" -. Safety is your Number 1 concern and seek <br /> I above the template(Figure 1-1). advice or outside help with tasks you cannot <br /> perform safely. <br /> I <br /> I <br /> ICOD-96 3 0 Miracle Steel Structures,Inc. 1996. <br />
The URL can be used to link to this page
Your browser does not support the video tag.