Laserfiche WebLink
I <br /> SECTION 1 <br /> I Construction Considerations <br /> IWhile there are countless types of foundation systems Frost action, soil bearing capacity, loading factors, <br /> you can consider the following four(4)types of building uses, local codes and other factors will help <br /> Ifoundation systems most often used are: drilled pier, determine the best foundation system for you. <br /> vertical pier with spread footing, perimeter wall and NOTE: Remember to refer to your previously <br /> footing and the thick-edged floating slab. <br /> I supplied anchor bolt setting plan and column detail <br /> plan along with this assembly guide during erection. <br /> IAnchor bolts <br /> Anchor bolt template <br /> ■ <br /> I <br /> 0 0� ;� • - 4 . .d <br /> 0 o $ 4A 4 <br /> I , CM%) i , <br /> .4 <br /> 0 splashboard <br /> IAnchor bolts , <br /> Figure 1-1 <br /> I <br /> 1 During the installation of your foundation, an easy way SPECIAL NOTE: <br /> to place your truss anchor bolts is with the use of a 1) Storage instructions are contained in your <br /> I truss template made of plywood as illustrated above. sheeting and roofing package. Follow these <br /> Secure plywood template to splashboard. Drill on the instructions carefully if you decide to store your <br /> template and locate the diameter holes for anchor building rather than to erect it immediately. <br /> I bolts according to anchor bolt setting plan <br /> 2) After cutting or drilling your sheeting, remember <br /> Install four(4) 1/2"anchor bolts, washers, and nuts to immediately remove any shavings in order to <br /> I into splashboard and two (2) anchor bolts into the prevent surface damage. <br /> template prior to concrete pour. Refer to anchor bolt <br /> setting plan for template anchor bolt size. Assure that 3) As in all construction projects, make sure that <br /> the two (2)template anchor bolts extend at least 2" -. Safety is your Number 1 concern and seek <br /> I above the template(Figure 1-1). advice or outside help with tasks you cannot <br /> perform safely. <br /> I <br /> I <br /> ICOD-96 3 0 Miracle Steel Structures,Inc. 1996. <br />