Laserfiche WebLink
I <br /> SECTION 1 <br /> I Construction Considerations <br /> IFirst, locate and layout the building A C <br /> on your land. One suggested <br /> imethod is as follows: <br /> 1. Stake out the four corners of <br /> your building as illustrated. To <br /> I square upthe building, the line —_— — — — _____ ___ —_— — — — —_— — —____._ --- <br /> AD below must be the same <br /> length as the line BC. <br /> I2. These corner stakes are Building Footprint <br /> only temporary. To mark the B D <br /> I <br /> excavation and foundation lines <br /> permanently, erect markers <br /> called"batter boards." Batter <br /> I boards usually consist of three <br /> stakes and connecting boards Batter Boards <br /> installed about three (3) feet .1` <br /> away from the foundation corner -14----111.1111 <br /> _ <br /> I as illustrated below. ► <br /> 3. A nylon cord is tightly stretched ` Corner of <br /> �� building ;I <br /> I along each foundation line to <br /> outline the building. A plumb V <br /> bob is hung from each corner <br /> I where the two cords intersect to <br /> mark the corner of your building. Plumb Bob Cord <br /> 11I <br /> I <br /> I — --, ' 147 <br /> I <:----- <br /> N <br /> i <br /> I <br /> \N Plumb Bob / <br /> N <br /> i <br /> \\\ / �� Outside perimeter <br /> 41 of building <br /> I titS *•;18 <br /> 141117 Nil <br /> I111141, <br /> ICOD-96 2 0 Miracle Steel Structures, Inc. 1996. <br />