My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04628 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
740 Orchard Park Road - 32-118-23-22-0007
>
Septic
>
2001-P04628 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:34 PM
Creation date
5/1/2018 12:05:20 PM
Metadata
Fields
Template:
x Address Old
House Number
740
Street Name
Orchard Park
Street Type
Road
Address
740 Orchard Park Road
Document Type
Septic
PIN
3211823220007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arne 16 2000 <br /> Re: Soil Boreings, Percolation Tests,System Design. <br /> We were retained by Brian Kerber to provide criteria for the design and installation of an on-site <br /> sewage system for the property located at 740 Orchard Road In the City of Orono. <br /> This design is based on a three bedroom,type one,single family home with maximum flaw of <br /> 450 gallons per day. <br /> A total of 6 soil borings and 4 perc tests were done. From these tests it was determined that a <br /> high water table exists at a depth of 18 inches below the ground surface. The high water table <br /> determines that only a mound type drainfield may be installed,to meet with code. <br /> The soils on this site are Erin Clay Loam,ErC2, 6 to 12%Slope as identified by the <br /> County soil map. Hennepin <br /> The system shall consist of the following: <br /> Two new 1000 gallon septic tanks <br /> -One new 1000 gallon pump chamber <br /> -675 square feet of rock bed,mound type drainfield <br /> -Upslope length of 93.5 feet <br /> -Width of 41 feet <br /> Materials needed for the mound construction include: <br /> -Clean washed sand 220 cubic yards <br /> -1.5 foot deep upsiope <br /> -1.8 feet deep-downslope <br /> -Clean washed rock,25 cubic yards <br /> -Sandy Loam soil,30 cubic yards <br /> -Top soil. 110 cubic yards <br /> The mound must be pressurized,therefore a pump must be installed that can pump 51 <br /> gallons <br /> per minute with a total head of 35 feet. An alarm system must also be installed to warn ofpump <br /> failure. <br /> The entire area that is to be used for the drainfield shall be protected from <br /> emy traffic to prevent <br /> any compaction priorto and during construction. Failure to do so shall resutt this design <br /> becoming VOID. At that lime the site may have to be tested again or an alternate site located <br /> and testing done. <br /> All neighboring wells are located greater than 100 feet from the proposed Tanfield site. <br /> intoNothing other <br /> deposed of s�eptr'csystemGwater �,showers etc.)humanposals waste&toilet tissue should be <br /> of more solids of a fine nature that may pass through the recommended due to the ad los <br /> ung & hiorine may kill the bacteria needed to treat Excess amounts ptic effluent.uerrt.Adai tsoap, <br /> kind must not be used. They may cause damage to the system. soap, <br /> of any <br /> it is recommended to pimp and service the septic tanks every two to three yews for maximum <br /> life of the system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.