My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: surveys/grading
Orono
>
Property Files
>
Street Address
>
O
>
Oliver Hill
>
2310 Oliver Hill - 34-118-23-33-0075
>
Correspondence
>
Re: surveys/grading
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:23 PM
Creation date
4/19/2018 9:40:54 AM
Metadata
Fields
Template:
x Address Old
House Number
2310
Street Name
Oliver
Street Type
Hill
Address
2310 Oliver Hill
Document Type
Correspondence
PIN
3411823330075
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, , ,► <br /> February 17,2015 <br /> 2310 Oliver HN <br /> Page 2 of 2 <br /> 3. Building Plans. The building plans show a future deck. lithe deck is not going to be constructed at this time, <br /> it must be removed from the construction plans. (For future reference,please assure the property's allowed <br /> 15%structural coverage level will support the additional structural square footage of the proposed deck.) <br /> 4. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require <br /> submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement <br /> to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will <br /> guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater.The required <br /> escrow amount for this project is$2,500. The escrow agreement is enclosed. The property owner must sign <br /> the escrow agreement and submit a check for$2,500. <br /> 5. Sewer Availability Charge(SAC). The 2015 SAC is 2,485. This fee is determined by the Metropolitan Council <br /> Environmental Services(MCES),collected by the City and passed on to the MCES. <br /> 6. Long Lake Sewer connection. The 2015 Long Lake Sewer Connection fee is$1,900.00 collected by Orono. <br /> PLEASE NOTE, NEW 2015 PERMIT REQUIREMENT: Prior to the commencement of any exterior/landscaping <br /> improvements,i.e.patios,grading,sidewalks,retaining walls,etc.,a Zoning Permit will be required. <br /> Your project may trigger the Minnehaha Creek Watershed District's(MCWD)permitting requirements;please contact <br /> the MCWD directly at 952-471-0590 regarding your project. Please note,the City of Orono will not issue a building <br /> permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not <br /> trigger any of their permitting requirements. The above information is required in order for the plan review to <br /> continue. Please feel free to contact me at 952.249.4620 or by email at cmattson.cl orono.mn.us if you have any <br /> questions on the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> iittaiotte <br /> Melanie Curtis <br /> Planner <br /> Copies via email:John van Dyck,Gordon James <br /> Dave&Chaleen Almsted <br /> Lyle Oman,Building Official <br /> enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.