Laserfiche WebLink
10/3.1/2017 04:36 FAX Zoos <br /> [ ) I Joints,penetrations,and all other such openings in the building envelope that are sources of air <br /> I leakage must be sealed. <br /> [ J Recessed lights must be 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly <br /> with a 0.5"clearance from combustible materials.If non-IC sated,the fixture must be installed with a <br /> 3"clearance from insulation. <br /> Vapor Retarder. <br /> [ J Required on the warm-in-winter side of all non-vented framed ceilings,walls,and floors. <br /> Materials Identification: <br /> [ J Materials and equipment must be installed in accordance with the manufacturer's installation instructions. <br /> [ I Materials and equipment must be identified so that compliance can be determined. <br /> [ J Manufacturer manuals for all installed heating and cooling equipment and service water heating <br /> equipment must be provided. <br /> [ ] Insulation R-'values,glazing U-factors,and heating equipment efficiency must be clearly marked on <br /> the building plans or specifications. <br /> Duct laudation: <br /> [ J Ducts in unconditioned spaces must be insulated to R-5. <br /> Ducts outside the building must be insulated to R-8.0. <br /> Duct Construction: <br /> [ J All joints,seams,and connections must be securely fastened with welds,gaskets,mastics <br /> (adhesives),mastic-plus-embedded-fabric,or tapes. Duct tape is not permitted. <br /> Exception:Continuously welded and locking-type longitudinal joints and seams on ducts <br /> operating at less than 2 in.w.g.(500 Pa). <br /> [ I Ducts shall be supported every 10 feet or in accordance with the manufacturer's instructions. <br /> [ J Cooling ducts with exterior insulation must be covered with a vapor retarder. <br /> [ I Air filters are required in the return air system. <br /> [ ] The HVAC system must provide a means for balancing air and water systems. <br /> Temperature Controls: <br /> [ 1 Thermostats are required for each separate HVAC system. A manual or automatic means to <br /> partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided <br /> Service Water Heating: <br /> [ ] Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the <br /> water heater has an integral heat trap or is part of a circulating system. <br /> [ I Insulate circulating hot water pipes to the levels in Table 1. <br /> Circulating Hot Water Systems: <br /> [ J Insulate circulating hot water pipes to the levels in Table 1. <br /> Swimming Pools: <br /> I I All heated swimming pools must have an on/off heater switch and require a cover unless over 20% <br /> of the heating energy is from non-depletable sources. Pool pumps require a time clock. <br /> Heating and Cooling Piping Insulation: <br /> [ I I HVAC piping conveying fluids above 105°F or chilled fluids below 55 °P must be insulated to the <br /> f levels in Table 2. <br />