My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00024 - new house
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
420 Lakeview Parkway - 06-117-23-32-0016
>
Permits/Inspections
>
2018-00024 - new house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:53 PM
Creation date
4/13/2018 3:36:50 PM
Metadata
Fields
Template:
x Address Old
House Number
420
Street Name
Lakeview
Street Type
Parkway
Address
420 Lakeview Pkwy
Document Type
Permits/Inspections
PIN
0611723320016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section B <br /> Ventilation Method <br /> (Choose either balanced or exhaust only) <br /> nBalanced,HRV(Heat Recovery Ventilator)or ERV(Energy Recovery Exhaust only <br /> Ventilator)—cfm of unit in low must not exceed continuous Continuous fan rating in cfm <br /> ventilation rating by more than]04%. <br /> Low cfm: A High cfm: ^ A Continuous fan rating in cfm(capacity must not exceed <br /> '+ I Y continuous ventilation rating by more than 100%) <br /> Directions-Choose the method of ventilation,balanced or exhaust only.Balanced ventilation systems are typically HRV or ERV's. <br /> Enter the low and high cfm amounts.Low cfm air flow must be equal to or greater than the required continuous ventilation rate and <br /> less than 100%greater than the continuous rate.(For instance,if the low cfm is 40 cfm,the ventilation fan must not exceed 80 cfm.) <br /> Automatic controls may allow the use of o larger fan that is operated a percentage of each hour. <br /> Section C <br /> Ventilation Fan Schedule <br /> Description Location Continuous Intermittent <br /> Directions-The ventilation fan schedule should describe what the fan is for,the location,cfm,and whether it is used for continuous <br /> or intermittent ventilation.The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating <br /> and less than 100%greater than the continuous rate.(For instance,if the low cfm is 40 cfm,the continuous ventilation fan must not <br /> exceed 80 cfm.)Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br /> Section D <br /> Ventilation Controls <br /> (Describe operation and control of the continuous and intermittent ventilation) <br /> ERV has wall control set to 40%=124 CFM <br /> ERV has wall control set to 80%=248 CFM <br /> Directions-Describe the operation of the ventilation system.There should be adequate detail for plan reviewers and inspectors to verify design and <br /> installation compliance.Related trades also need adequate detail for placement of controls and proper operation of the building ventilation.If exhaust fans <br /> are used for building ventilation,describe the operation and location of any controls,indicators and legends.If an ERV or HRV is to be installed,describe how <br /> it will be installed.If it will be connected and interfaced with the air handling equipment;please describe such connections as detailed in the manufactures' <br /> installation instructions.If the installation instructions require sr:ecammcnd the equipment to be interlocked with the air handling equipment for proper - • <br /> operation,such interconnection shall be made and described. <br />
The URL can be used to link to this page
Your browser does not support the video tag.