My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Low pressure sewage system manual
Orono
>
Property Files
>
Street Address
>
O
>
Old Long Lake Road
>
0625 Old Long Lake Road - 36-118-23-32-0003
>
Misc
>
Low pressure sewage system manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:36 PM
Creation date
4/11/2018 11:37:04 AM
Metadata
Fields
Template:
x Address Old
House Number
625
Street Name
Old Long Lake
Street Type
Road
Address
625 Old Long Lake Road
Document Type
Misc
PIN
3611823320003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN INSTALLATION INSTRUCTIONS <br /> Step2 <br /> if the basiUTIONs not tied down during installation, <br /> Lifting of the basin may be done with a nylon or other <br /> rain or flood conditions may cause the basin to non-damaging type material sling. Do not wrap a chain <br /> float upward,causing damage to the basin or or steel cable around the basin as damage may result. <br /> basin connections. Do not attach lifting mechanism around discharge hub <br /> or electrical hub. <br /> A DANGER <br /> Basin System Handling: Risk of electrical shock or electrocution. May result <br /> Factory built basin systems must not be dropped, in serious injury or death or fire hazard. Failure to <br /> dragged, rolled,or handled with sharp objects. properly support electrical conduit, lines and <br /> Improper handling of basins may result in damage to connections may result in structural failure. Electrical <br /> the basin,damage to basin components,or leaks in connections may be damaged exposing live electrical <br /> the piping assemblies. <br /> connections. <br /> Step 1 Step 3 <br /> The pad under the basin, requires 4 to 6 inches of Lower the basin into excavation, position and level <br /> appropriate fill.The ideal basin pad is concrete in properly. Mount basin to base anchor bolts if an <br /> conjunction with anti-flotation tie-down studs. Basin anti-flotation tie-down kit is used. If basin is fiberglass, <br /> anti-flotation tie-down kits are available from Delta inspect basin and seal off any cuts or scratches to <br /> Environmental Products. If concrete pad is not used, prevent fiberglass deterioration. <br /> the aggregate must be compacted to a minimum <br /> 85%standard proctor density per ASTM D698,or <br /> as required by the Authority Having Jurisdiction. <br /> Concrete pad or aggregate surface must be leveled <br /> flat and free of voids to conform to the basin bottom. <br /> Basin bedding depth should be calculated such that <br /> the basin top will protrude 3"above the normal grade <br /> upon final installation. <br /> 05625-459-1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.