My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#1697-sewer connection-1984
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
1150 Old Crystal Bay Road South - 09-117-23-13-0004
>
Resolutions
>
#1697-sewer connection-1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:48:45 PM
Creation date
4/10/2018 11:53:37 AM
Metadata
Fields
Template:
x Address Old
House Number
1150
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
South
Address
1150 Old Crystal Bay Rd S
Document Type
Resolutions
PIN
0911723130004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> .' No <br /> • City Of ORO <br /> CITY • RESOLUTION OF THE CITY Cols ITEM HAS <br /> OF NO. 1697 BEEN <br /> ORONO • MICROFIL•MED <br /> FINDINGS <br /> 1 . The metro sewer line was originally constructed by the <br /> City of Orono. The sewer project (LS-63-1 ) was assessed and <br /> constructed in 1963 prior to the adoption of Orono's <br /> Comprehensive Sewer Plan and Comprehensive City Wide Zoning. <br /> 2. The property is already served by an existing sewer <br /> service stub. Connection will not involve extension of <br /> existing metro line. . <br /> • <br /> 3. Unit capacity is available within the MWCC line. • <br /> 4. The property was assessed for lateral sewer. <br /> 5. The residence• on the developed lot within the proposed <br /> • subdivision is served by sewer. <br /> 6. The maximum number of sewer units for the property does <br /> not exceed the maximum number of residential units allowed <br /> on the property based on the minimum rural residential <br /> density of 1 unit per 2 acres of dry buildable area. <br /> 7. Zoning will remain rural and all development will occur <br /> in strict conformance with the rural district requirements <br /> including use, lot size, setbacks and all pertinent rural <br /> performance standards. <br /> 8. The property could sustain an on-site septic system if <br /> required. <br /> FURTHERMORE, BE IT RESOLVED that based upon the above <br /> findings the Orono City Council hereby directs its Mayor and City <br /> Clerk to execute the MWCC connection permit application and upon <br /> Council 's approval of the final plat of Breckenridge further <br /> directs the City Clerk to transmit the executed permit <br /> application to the Metro Waste Control Commission. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.