Laserfiche WebLink
RECEIVED <br /> JUN 15 2016 ' <br /> g <br /> 9 - CITY OF ORONO <br /> O <br /> PART 1: GENERAL 2.02 BOULDERS 3.02 FOUNDATION SOIL PREPARATION <br /> a 1.01 DESCRIPTION A. BOULDERS SHALL MEET THE MINIMUM REQUIREMENTS OF BOULDER A. FOUNDATION SOIL SHALL BE EXCAVATED AS REQUIRED FOR MINIMUM <br /> o A. WORK INCLUDES FURNISHING AND INSTALLING A BOULDER RETAINING DEPTH SCHEDULE. EMBEDMENT DEPTH SHOWN ON THE CONSTRUCTION DRAWINGS,OR AS <br /> c WALL TO THE LINES AND GRADES SHOWN ON THE CONSTRUCTION B. BOULDERS SHALL BE SOUND AND DURABLE, USE FIELDSTONE, GRANITE, DIRECTED BY THE ENGINEER. <br /> S DRAWINGS AND SPECIFIED HEREIN. LIMESTONE,OR OTHER TYPES OF NATURAL STONE. B. UNSUITABLE SOILS SHALL BE REMOVED AND REPLACED WITH SUITABLE <br /> O B. WORK INCLUDES PREPARING FOUNDATION SOIL, FURNISHING AND 2.03 DRAINAGE AGGREGATE STRUCTURAL FILL TO ACHIEVE THE REQUIRED BEARING CAPACITY. <br /> O INSTALLING DRAINAGE STONE AND BACKFILL TO THE LINES AND GRADES A. DRAINAGE AGGREGATE SHALL BE ANGULAR AND SHALL NOT BE RIVER C. STRUCTURAL FILL SHALL BE COMPACTED IN 6"LIFTS TO A MINIMUM 95% <br /> SHOWN ON THE CONSTRUCTION DRAWINGS. STANDARD PROCTOR DENSITY(ASTM D698). <br /> �, ROCK OR PEA GRAVEL <br /> Oz C. WORK INCLUDES FURNISHING AND INSTALLING ALL RELATED MATERIALS B. DRAINAGE AGGREGATE SHALL CONSIST OF CLEAN 1" CRUSHED STONE 3.03 BASE COURSE PLACEMENT <br /> �, REQUIRED FOR CONSTRUCTION OF THE RETAINING WALL AS SHOWN ONMEETING THE FOLLOWING GRADATION: A. PLACE GEOTEXTILE FABRIC AND SET THE FIRST COURSE OF BOULDER IN <br /> THE CONSTRUCTION SHOP DRAWINGS. <br /> 1.02 REFERENCE STANDARDS SIEVE SIZE %PASSING PLACE ON TOP OF GEOTEXTILE FABRIC. <br /> 1" 100 B. TRY TO POSITION BOULDERS WITH THE SMOOTHEST SIDE UP SO THE <br /> A. ASTM C1372 SEGMENTAL RETAINING WALL UNITS. NEXT COURSE HAS GOOD SURFACE CONTACT. <br /> B. ASTM C140 SAMPLING AND TESTING CONCRETE MASONRY UNITS. 3/4" 100.75 C. DURING PLACEMENT OF BASE BOULDERS,MAKE ENDS FIT AS TIGHTLY AS <br /> a C. ASTM D448 SIZES OF AGGREGATE FOR ROAD AND BRIDGE N0.4 0-10 POSSIBLE TO EACH OTHER. <br /> NO.50 0.5 D. IF BOULDERS ARE NOT TIGHT AGAINST THE EXCAVATED CUT, PULL <br /> o CONSTRUCTION. C. FREE DRAINING SAND IS ALSO ACCEPTABLE FOR THE DRAINAGE <br /> D. ASTM D698 LABORATORY COMPACTION CHARACTERISTICS USING MATERIAL IT MUST HAVE <5%FINES PASSING THE NO. 200 SIEVE.ONSITE FABRIC FORWARD AND BACKFILL BEHIND BOULDER <br /> STANDARD EFFORT. MATERIAL IS ACCEPTABLE IF IT MEETS THIS CRITERIA. E. BACKFILL SOIL AGAINST THE BACK OF THE FIRST COURSE AND COMPACT <br /> 1.03 QUALITY ASSURANCE 2.04 RETAINED BACKFILL THOROUGHLY. BACKFILL UP TO THE HEIGHT OF THE BASE COURSE TO <br /> A. OWNER WILL BE RESPONSIBLE FOR SOIL TESTING AND INSPECTION PROVIDE A LEVEL SURFACE FOR THE SECOND COURSE OF BOULDERS. <br /> o QUALITY CONTROL DURING EARTHWORK OPERATIONS. A. RETAINED BACKFILL SHALL BE FREE OF DEBRIS OR ORGANIC MATERIAL 3.04 SUBSEQUENT COURSE PLACEMENT <br /> MEETING THE FOLLOWING GRADATION: <br /> 1.04 DESIGN SAFETY FACTORS SIEVE SIZE %PASSING A. THE SECOND AND SUBSEQUENT COURSES SHOULD BE SET BACK INTO THE <br /> C A. THE BOULDER WALLS ARE DESIGNED AS GRAVITY WALLS: 2" 100 HILL TO PROVIDE STRENGTH FOR THE WALL. <br /> U 3/4" 100.75 B. PLACE BOULDERS ON TOP OF THE BASE COURSE SO THAT SEAMS IN THE <br /> MINIMUM SAFETY FACTOR FOR OVERTURNING 1.5 NO.4 20.100 SECOND COURSE DO NOT MATCH SEAMS OF THE FIRST COURSE.IF SEAMS <br /> ("3. MINIMUM SAFETY FACTOR FOR SLIDING 1.5 NO.200 0-60 MATCH,IT WILL CREATE A WEAK SPOT IN THE WALL <br /> Ln <br /> MINIMUM SAFETY FACTOR FOR BEARING 2.0 <br /> PLASTICITY INDEX(PI)<20 C. SELECT EACH BOULDER TO FIT AS TIGHTLY AS POSSIBLE WITH THE <br /> LIQUID LIMITS(LL)<40 <br /> S PART 2: MATERIALS ADJACENT BOULDERS. ROTATE BOULDERS UNTIL A GOOD FIT IS <br /> B. THE MAXIMUM AGGREGATE SIZE SHALL BE LIMITED TO 2"UNLESS FIELD ACHIEVED. THE WALL WILL BE STRONGER WITH MORE SURFACE AREA <br /> W 2.01 DEFINITIONS TESTS HAVE BEEN PERFORMED TO EVALUATE POTENTIAL STRENGTH CONTACT BETWEEN BOULDERS DUE TO THE FRICTION THAT IS CREATED. <br /> En A. BOULDERS-SOUND,DURABLE ROCK FRAGMENT SHAPED BY EROSION AND REDUCTION TO INSTALLATION. 3.06 FILL PLACEMENT <br /> TRANSPORTED BY ICE OR WATER FROM ITS ORIGINAL POSITION. C. MATERIAL CAN BE SITE EXCAVATED MATERIAL WHEN THE ABOVE <br /> 02 B. DRAINAGE AGGREGATE - FREE DRAINING CRUSHED STONE WHICH IS REQUIREMENTS ARE MET. UNSUITABLE SOILS FOR BACKFILL (HIGH A. BACKFILL MATERIAL SHALL BE PLACED WITH A MAXIMUM OF 8"LIFTS AND <br /> zCOMPACTED TO 95%OF STANDARD PROCTOR DENSITY.AS DETERMINED <br /> �, PLACED WITHIN AND IMMEDIATELY BEHIND THE BOULDER FACING. PLASTIC CLAYSOR ORGANIC MATERIALS) SHALL NOT BE USED IN THE IN ACCORDANCE WITH ASTM D698. THE IN PLACE MOISTURE CONTENT <br /> N C. FOUNDATION SOIL - SOIL ZONE IMMEDIATELY BENEATH THE BOTTOM REINFORCED SOIL MASS. SHALL NOT EXCEED THE OPTIMUM MOISTURE CONTENT AS DETERMINED <br /> z0 BASE BOULDERS. D. CONTRACTOR SHALL SUBMIT REINFORCED FILL SAMPLE AND TEST IN ACCORDANCE WITH ASTM D698 AND BE NO LOWER THAN 2%BELOW <br /> .. D. RETAINED BACKFILL - SOIL IMMEDIATELY BEHIND THE DRAINAGE RESULTS TO THE ARCHITECT/ENGINEER FOR APPROVAL PRIOR TO OPTIMUM MOISTURE CONTENT. <br /> o AGGREGATE. CONSTRUCTION. B. DO NOT BRING HEAVY COMPACTION OR PAVING EQUIPMENT WITHIN 3 <br /> cn <br /> E. SUBSURFACE DRAINAGE SYSTEM-A SYSTEM FOR REMOVING WATER FROM PART 3: EXECUTION FEET OF THE BACK OF THE PROPOSED RETAINING WALL ONLY <br /> BEHIND THE WALL AND CHANNELING IT TO A POINT OF POSITIVE 3.01 EXCAVATION HAND OPERATED COMPACTION EQUIPMENT (E.G. TAMPER, PLATE <br /> DRAINAGE. A. CONTRACTOR SHALL EXCAVATE TO THE LINES AND GRADES SHOWN ON COMPACTOR, SHEEPS FOOT ROLLER) SHALL BE USED WITHIN 3 FEET OF <br /> O THE BACK OF WALL <br /> THE CONSTRUCTION DRAWINGS.CONTRACTOR SHALL BE CAREFUL NOT <br /> TO DISTURB EMBANKMENT AND FOUNDATION MATERIALS BEYOND LINES <br /> a SHOWN. <br /> z <br /> 0 <br /> 0 <br /> o - <br /> J <br /> Z <br /> 0 <br /> m <br /> 0 <br /> N <br /> O <br /> .12 <br /> z 070/4—004o $ 0 <br /> 0 <br /> r 1 PDeeigne.JBy: Polka: Regkmtlon Na <br /> I hereby cern that this pl ification,or report was prepared by <br /> No. Date Revision av p 25493 me or under y dire t.. . "ion and that I am a duly Licensed <br /> 1130 OLD CRYSTAL BAY ROAD laws of the State of Minnesota. <br /> $ 1 ORONO,MINNESOTA Professional ngi <br /> (21'vILDESIGN 2 i`boso9 r <br /> §: CpV N.T.S. <br /> PROFESSIONALS 3 — TISk: — it <br /> seasLYN°^�^`�"eSo"n'atn„e:0aBLOOMINGTON,M °s.m s SPECIFICATIONS Sheer /1O/I <br /> PHONE.1952))035)1IIPAX.imnSPt•+995I WEIIWTP.VWw.CDRUS.COM JUN 13,2016 - 3.00"1/4 ace: <br /> 112)1",vnon,w1rONAMMeMIA annum,na»IIw»4,,u `6 ! ! MICHAEL R.�HN"�N,P.E. <br />