My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00688 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
1130 Old Crystal Bay Road South - 09-117-23-14-0007
>
Permits/Inspections
>
2016-00688 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:06 PM
Creation date
4/9/2018 3:38:34 PM
Metadata
Fields
Template:
x Address Old
House Number
1130
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
South
Address
1130 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0911723140007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(pc) CIVILDESIGN RECEIVED <br /> PROFESSIONALS UN 2018 <br /> INNOVATIVE ENGINEERING SOLUTIONS <br /> CITY OF ORONO <br /> June 13, 2016 <br /> Katie Nicklow <br /> Sou'thview Design <br /> RE: 1130 Old Crystal Bay Road Retaining Walls(16-0509) <br /> Orono,Minnesota <br /> Design Assumptions: <br /> Boulders <br /> Wall Batter: 15° Design: Coulomb <br /> Live Load: 50 PSF Dead Load: None <br /> Toe Slope: 4H:1V Back Slope: None <br /> Seismic: N/A Applied Bearing: 2,250 PSF <br /> Soil Design Properties: y c <br /> Retained Soil 26° 120 PCF 0 PSF (Sandy Lean Clay) <br /> Foundation Soil 26° 120 PCF 0 PSF (Sandy Lean Clay) <br /> Notes: <br /> No soils or geotechnical information was provided or available at the time of this design. Soil borings should <br /> be drilled along the walls prior to construction.The onsite material is assumed to be a Sandy Lean Clay with <br /> an internal friction angle of 26°. Where unsuitable soils are found, a subcut may be required and structural <br /> fill shall be placed and compacted to provide an adequate bearing foundation. The above minimum soil <br /> strength parameters shall be verified prior to construction. CDP shall be contacted if the above soil strength <br /> parameters cannot be met and a redesign may be required. <br /> A global stability analysis has been performed using the soil design parameters as listed above. The project <br /> geotechnical engineer shall confirm global stability based on the proposed wall design and the actual <br /> parameters of the onsite soils. <br /> During wall construction, excavation shall remain within the construction limits shown on the plans. All <br /> available means and methods used to keep excavation within the construction limits shall be incidental. The <br /> contractor shall coordinate relocation of all existing conduits and services with the utility provider. <br /> We appreciate the opportunity of providing services to you. If you have any questions or comments regarding <br /> this project,please feel free to contact us. <br /> Sincerely, <br /> Daniel V. Kennedy <br /> Civil Design Professionals • 8609 Lyndale Ave.S.,Suite 200 Bloomington,MN 55420 • Office(952)303-5312 • www.cdp-us.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.