My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00601-NOT COMPLETED
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
1100 Old Crystal Bay Road South- 09-117-23-14-0001
>
Permits/Inspections
>
2012-00601-NOT COMPLETED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:02 PM
Creation date
4/6/2018 2:15:58 PM
Metadata
Fields
Template:
x Address Old
House Number
1100
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
South
Address
1100 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0911723140001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Violation of the provisions of this article or failure to comply with any of its requirements(including violations of <br /> conditions and safeguards established in connection with grants of variances or conditional uses) shall constitute a <br /> misdemeanor and shall be punishable as defined by law. <br /> (Ord. No. 28 3rd series, § 1, 8-22-2005) <br /> Sec. 78-1614.Authority/enforcement actions. <br /> Nothing herein contained shall prevent the city from taking such other lawful action as is necessary to prevent or remedy <br /> any violation. Such actions may include but are not limited to: <br /> (1) In responding to a suspected article violation, the planning director and the city may utilize the full array <br /> of enforcement actions available to it including but not limited to prosecution and fines, injunctions, after-the-fact <br /> permits, and/or orders for corrective measures to the guilty party. <br /> (2) When an article violation is either discovered by or brought to the attention of the planning director, the <br /> planning director shall immediately investigate the situation and document the nature and extent of the violation of the <br /> official control. As soon as is reasonably possible, this information will be submitted to the MCWD along with the <br /> community's plan of action to correct the violation to the degree possible. <br /> (3) The planning director shall notify the suspected party of the requirements of this article and all other <br /> official controls and the nature and extent of the suspected violation of these controls. If the structure and/or use is <br /> under construction or development, the planning director may order the construction or development immediately halted <br /> until a proper permit or approval is granted by the community. If the construction or development is already completed, <br /> then the planning director may either: (1) issue an order identifying the corrective actions that must be made within a <br /> specified time period to bring the use or structure into compliance with the official controls; or(2) notify the responsible <br /> party to apply for an after-the-fact permit/development approval within a specified period of time not to exceed 30-days. <br /> (4) If the responsible party does not appropriately respond to the planning director within the specified <br /> period of time,each additional day that lapses shall constitute an additional violation of this article and shall be <br /> prosecuted accordingly.The planning director shall also upon the lapse of the specified response period notify the <br /> landowner to restore the land to the condition which existed prior to the violation of this article. <br /> (Ord. No. 28 3rd series, § 1, 8-22-2005) <br /> Secs. 78-1615--78-1630. Reserved. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.