My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00601-NOT COMPLETED
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
1100 Old Crystal Bay Road South- 09-117-23-14-0001
>
Permits/Inspections
>
2012-00601-NOT COMPLETED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:02 PM
Creation date
4/6/2018 2:15:58 PM
Metadata
Fields
Template:
x Address Old
House Number
1100
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
South
Address
1100 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0911723140001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) No alteration of land within a wetland overlay district or a wetland buffer is allowed without a wetlands <br /> -alteration permit, subject to recommendation by the planning commission and approval of the city council.The planning <br /> commission must hold a public hearing after notifying the property owners within 350 feet of the property on which the <br /> proposed alteration will occur. Activities that constitute an alteration regulated by this section include changes to the size, <br /> depth or contour of the wetlands or its buffer, dredging, or alterations of wetlands or buffer vegetation. Alterations do not <br /> include wetland planting or the selective clearing or pruning of trees or vegetation that are dead, diseased, noxious <br /> weeds or similar hazards. A wetland alteration permit is not required when a wetland district is rezoned to another zoning <br /> classification. <br /> (b) Alteration of land within a wetland overlay district will only be allowed if water storage is provided in an <br /> amount compensatory to that removed. Unless otherwise approved by the city council, compensatory wetland area must <br /> be provided within the same subwatershed district as the wetland being altered. In determining the appropriateness of an <br /> alteration request, the city council will consider the size of the total wetland district, the magnitude of the area proposed <br /> for alteration, the aesthetic, hydrological and ecological effect, the type and function of wetlands involved, and such other <br /> factors as may be appropriate in order to provide the maximum feasible protection to the wetlands. Application for a <br /> wetlands alteration permit must be accompanied by such information as required by the city, including: <br /> (1) A copy of the wetland replacement plan application submitted to the MCWD; <br /> (2) A concept plan showing the ultimate use of the property; <br /> (3) A grading plan, in hard copy format and a CAD or GIS format in Hennepin County coordinates, with <br /> appropriate drainage calculations and erosion controls prepared by a registered engineer; <br /> (4) A landscaping or revegetation plan; <br /> (5) Such other information as may be necessary or convenient to evaluate the proposed permit; and <br /> (6) A MnRAM assessment approved by the MCWD. <br /> (Ord. No. 28 3rd series, § 1, 8-22-2005) <br /> Sec. 78-1611. Public control of wetlands. <br /> (a) The city council may require that the owner of any property affected by this article must establish <br /> wetland and buffer area easements or restrictive covenants to be recorded within the property's chain of title.These <br /> easements or covenants must describe the boundaries of the wetland and buffer area; document the obligations of the <br /> property owner with regards to the wetland buffer; and prohibit any building, paving, mowing (unless approved as a <br /> buffer management plan), cutting, filling, dumping, yard waste disposal or fertilizer application within the wetland and the <br /> buffer area.The owner or developer must record these easements or covenants with the final plat, with deeds from a lot <br /> division or, if no subdivision is involved, before the city issues a grading permit or building permit for an affected <br /> property.The applicant must submit evidence that the easement or covenant has been submitted to the county for <br /> recording. <br /> (b) If the city council does not require an easement or covenant, the city may record a notice of the wetland <br /> and buffer area requirements against the property. The property owner must still comply with the requirements of this <br /> section. <br /> (Ord. No. 28 3rd series, § 1, 8-22-2005) <br /> Sec. 78-1612. Wetland buffer markers. <br /> When new development or redevelopment results in multifamily residential or a business use, the developer must place <br /> markers at the upland boundary of the wetland buffer edge at least every 200 feet, subject to city approval. The <br /> developer must submit a location plan in hard copy format and a CAD or GIS format in Hennepin County coordinates and <br /> must use uniform markers provided by the city. The city will charge a reasonable cost for the markers and approve the <br /> location of the markers prior to installation. <br /> (Ord. No. 28 3rd series, § 1, 8-22-2005) <br /> Sec. 78-1613.Violations. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.