My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso #6835
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Rd
>
1400 Bracketts Point Rd - PID: 11-117-23-32-0025
>
Resolutions
>
Reso #6835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:30:22 PM
Creation date
4/4/2018 2:54:29 PM
Metadata
Fields
Template:
Address
House Number
1400
Street Name
Bracketts Point
Street Type
Road
Address
1400 Bracketts Point Road
Document Type
Resolutions
PIN
1111723320025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Plat Application 18-3999 6 8 3 5 <br /> Southways Addition <br /> Page 4 <br /> 4.0 PRELIMINARY STREET PLAN <br /> 4.1 A minimum 15"culvert should be provided under driveways and roads to limit potential for <br /> clogging. <br /> 4.2 Proposed curb should be indicated as B612 Curb and Gutter,and a detail should be provided with <br /> Final Plans. <br /> 4.3 Bituminous pavement should be saw-cut to full depth at connection to existing to provide clean <br /> match lines. Pavement at connection should match existing elevation and section. Final limits <br /> should be coordinated in the field with the City prior to any demolition work. <br /> 4.4 Pipe characteristics should be provided for all proposed storm sewer and culverts(i.e. invert <br /> elevations,diameter,length, slope, and material). Culverts under the roadway should be <br /> concrete. Provide minimum 2' cover. <br /> 5.0 PRELIMINARY LANDSCAPE PLAN <br /> 5.1 The Final Landscape Plan should include the following: <br /> a. Types and locations of proposed restoration. <br /> b. Abandoned road should indicated removal of pavement and restoration type. <br /> c. De-compaction of existing soils under removed impervious surfaces with 12"ripping depth <br /> prior to placement of topsoil. <br /> d. Areas disturbed by sanitary manhole removal. <br /> e. Restoration of the existing rain garden at the south street connection. <br /> f. Trees should be located so as not to interfere with drainage. In rural section areas, trees may <br /> need to be placed outside the right-of-way. <br /> If you have any questions or comments,please contact me to discuss. <br /> Sincerely, <br /> Bolton&Menk,Inc. <br /> 6CsafrA <br /> Robert E.Bean,Jr.,P.E. <br /> Water Resources Engineer <br /> CC: Adam Edwards, City of Orono <br /> H:\ORNO\C13115486\z-18-3999 Brackets Point\Southways_PrePlatReview-1 2018-01-09.docx <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.